audit of land-fill materials only?
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Jutta Berns on
our hotel project already has in place a rigorous waste diversion programme, where 80%+ is diverted from landfill.
Flush-Out Requirement for a Naturally Ventilated Building
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Eric Carbonnier on
The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.
Steel extraction location
NC-2009 MRc5:Regional materialsposted by Tiffany Moore on
I feel like broken record on this topic, because I know I've been through this before.
Pre-Owned furniture
CI-2009 MRc4:Recycled contentposted by Susan Di Giulio on
If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?
SRI required testing amounts
NC-2009 SSc7.2:Heat island effect - roofposted by Anna Korinkova on
Hello, could anybody tell me how we can state the number of SRI tests on a project? We intend to place gravel on the roof and provide a concrete parking log.
Workspace opens to exterior and interior
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Peter Doo on
We have a project that includes a workshop/studio space.
Parking Garage above Non LEED Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kar Kerman on
I'm not sure whether I can (or should) include a parking garage in a project I'm working on. The parking garage is located in an adjacent building and has a separate owner.
Building core concrete floors as a "reused" material?
CI-2009 MRc3.1:Materials reuseposted by Alex Silber on
Office TI project in a downtown high rise building - rather than installing a finish floor product (e.g.
Solvent free Coating
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Panupant Phapant on
If our project use solvent-freee coating. Do we still need VOCs testing result from our supplier?
Solar PV System Degradation
NC-2009 EAc2:On-site renewable energyposted by Katherine Ann Resurreccion on
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.