Healthcare-v2009 IDp1:Integrated project planning and designposted by Kim Lombard on
Some of our team members have changed throughout the lengthy design and construction process of a Major Hospital.
Existing building renovation - unknown existing envelope
NC-2009 EAp2:Minimum energy performanceposted by Ron Dean on
Hi, To do the baseline model envelope I believe I should use the existing one (previous to any alteration).
Simulation software and Ashrae 90.1 version
CS-2009 EAc1:Optimize energy performanceposted by Antonio Márquez on
Hi, we are certifying a new C&S building, in v2009. The version of Ashrae 90.1 to follow is 2007?
Rubber Flooring
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by ethen mcmanus on
I'm working on a project that is classified as "New Construction" & not a "School Project" My LEED Reference guide for green building design & construction updated as of June 2010 states t
Changing out fixture trim after the performance period
EBOM-2009 WEc2:Additional indoor plumbing fixture and fitting efficiencyposted by Tom Kennedy on
We're in the middle of our response to the reviewer's comments on our initial submission (so our performance periods ended a few months ago). Let's say we decide now that we should change out some
Daily Occupancy for a cinema
Retail-CI-v2009 WEp1:Water use reductionposted by LEED Pro Consultant on
Im working on a CI Cinema Project , there are some areas like Fast Food Service, how can I determinate the occupancy for the persons that are going to the cinema, under Visitors or Customer Retail?
Daily Occupancy for Cinema
CI-2009 WEp1:Water use reductionposted by LEED Pro Consultant on
Im working on a CI Cinema Project , there are some areas like Fast Food Service, how can I determinate the occupancy for the persons that are going to the cinema, under Visitors or Customer Retail?
Baseline Lighting Power for a Major Renovation
NC-2009 EAp2:Minimum energy performanceposted by Curtis Clark on
We are replacing the mechanical system, updating the plumbing system and insulating the building envelope for an existing office building.
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize energy performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?
Demand control ventilation requirement
CI-2009 EAp2:Minimum energy performanceposted by Gustav Alfaro on
Hi to all: In our project we have a cafeteria (2,000ft2) with the following features: 1. a density of 55 people per 1,000ft2 2. The outdoor airflow (3,600 cfm) is being delivered by an DOAS 3.