Forum quick links
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?
Non-Smoking Policy
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Erika Duran on
Dear All, I have a hotel project that has a non smoking policy for the entire hotel.
Mixed-mode ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Lise Dannesboe on
Dear all! How do you show compliance with case 1 for GBCI, mixed-mode ventilation?
HET Retrofit
NC-2009 WEc3:Water use reductionposted by Matthew Catterall on
I've noticed that dual-flush flushometer retrofit kits are mentioned as a way to earn this credit on existing commercial toilets (rather than replace the entire toilet); however, there is no mentio
Residents excluded?
EBOM-2009 SSc4:Alternative commuting transportationposted by Miranda Lescaze on
A portion of our building is office space and a portion is multi-family senior residences.
WEp1 - PIf3 link - new LEED on line
NC-2009 WEp1:Water use reductionposted by Todd Bundren on
My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice).
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
government areas
NC-2009 SSc2:Development density and community connectivityposted by patricia vasconcellos on
I have a project that is in a government area. A region of the city that has been set aside to house all the public departments.
Owner installed lighitng
CI-2009 EAp2:Minimum energy performanceposted by Allen Cornett on
I am trying to find out if a building owner is installing new lighting in a space, will a future tenant be able to included the existing lighting in the lighting power density calculations for EAp2
Task light process load or lighting load?
NC-2009 EAp2:Minimum energy performanceposted by Haojie Wang on
I saw some people say task light is process load but sometimes it can be count into lighting power. I wonder is there a good way to treat task light?