Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
2009 calculator - "private" bathrooms in a commecial facility
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Jessica Hawley on
I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.
CORE area and SHELL area
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Yodi Danusastro on
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.
Baseline for Blow-out Fixtures
CS-2009 WEp1:Water use reductionposted by study topenergy on
According to the Water Use Reduction Additional Guidance (April 2013), when selecting the "Blow-out fixture" option, the 3.5 gpf baselne should also be used for the installed case.
Non recyclables in recycling stream
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Vanessa Seibert on
I think I know the answer but just want to double check.
Parking space ownership
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?
Parking spaces owned
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual buyers?
Target Finder: Design vs Target
NC-2009 EAp2:Minimum energy performanceposted by Rock Ridolfi on
All, new to energy modeling and reviewing the EAp2 online template trying to figure out the required inputs and reports for the Target Finder section, Design vs Target.
LEED "Owner" (vs. Leasing)
Retail-NC-v2009 PIf3:Occupant and Usage Dataposted by Serena Wray on
I am working with a national retailer who controls the design of their own stores and all LEED decisions that are made regarding those stores.
Total material cost
NC-2009 MRc5:Regional materialsposted by Sahar Abi-Ziki on
Hello, In our project, we decided to estimate real total material cost without equipments and labor for division 2-10. What kind of proof the contractor needs to present in this case?