Pressure drop adjustment factor with DOAS System
CS-2009 EAc1:Optimize energy performanceposted by Curtis Clark on
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.
MR c7 forms
NC-2009 MRc7:Certified woodposted by Mark Ramsey on
As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.
SHGC Value ASHRAE 90.1-2007
NC-2009 EAp2:Minimum energy performanceposted by John Covello on
Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.
Air Quality Testing - Elevator Lobbies in Parking Garage
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Katherine Wilde on
Our project has 4 garage levels. There are 3-4 elevator lobbies on each level. The lobbies are small and receive OA from RTUs serving the offices above.
MRc7 How does this credit work?
NC-2009 MRc7:Certified woodposted by Sara Axon on
If we are asked to provide for 1 point or 50% FSC Wood by cost but are making casework, do we have to ship the casework as FSC certified?
FSC Certified Millwork
NC-2009 MRc7:Certified woodposted by Andy Prestridge on
We have a fair amount or T&G wood that is being installed on the Ceiling.
Major Renovation vs. New Construction
NC-v4 EAc2:Optimize energy performanceposted by Eric Webber on
We are in the conceptual design phase of a project consisting of renovations to an existing building and a significant addition.
case 1, however what happens if space will be owned
CI-2009 EAc3:Measurement and verificationposted by Courtney Royal on
for example, the project is a large building with a commercial spaces on each floor that will be sold.
Reopening one path of LEED-CI SSc1.2 in Construction Review
CI-2009 SSc1:Site selectionposted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
Exhaust fan for chemical storage
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Yaser Al Sharif on
If We have chemical storage room with 69.4 ft square in Area in our building , i want to install one exhaust fan for this room to acheive credit requirements , how can i calculate minimum pressure