Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Exterior Lighting Baseline vs Proposed

NC-2009 EAp2:Minimum energy performance
posted by  Maria Unruh  on 

I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?

1
Tue May 26, 2015, 7:42 pm

initial fit-out vs alteration?

Retail-CI-v2009 PIf2:Project Summary Details
posted by  Andrew Bennett  on 

What is the difference between initial fit-out and alteration square footages?

0

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of systems - lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

IEQp1

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Gordon Nielson  on 

I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.

1
Wed May 27, 2015, 8:14 pm

Rating System Path

ND-v4 MPR2:Must use reasonable LEED boundaries
posted by  Philippa Cameron  on 

Hi, Can you please help me confirm how we verify LEED ND: Built Project as the suitable rating system path to follow, and set the boundary to accommodate this? The guidance states that: a.

1
Thu May 28, 2015, 6:37 pm

Off-site area counted for two LEED projects

EBOM-2009 SSc5:Site development - protect or restore open habitat
posted by  Anna Korinkova  on 

There are two buildings to be certified, the same Owner, located on the same campus.

1
Tue Jun 2, 2015, 7:16 pm

How to deal with a multi-use college residence hall

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Mike Stopka  on 

I am working on a rather unique residence hall building that has a variety of uses. I am trying to determine what spaces need bike storage and shower/changing facilities.

1
Mon Jun 1, 2015, 10:18 am

IEQp1 ventilation cals

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Gordon Nielson  on 

I am calculating the ventilation requirements for a conference room. From the ASHRAE Table 6-1 I selected .06 cfm/ft2 and 5 cfm/person. The room has occupancy of 8 people.

1
Fri May 29, 2015, 4:37 pm

1 year contract?

NC-2009 EAc6:Green power
posted by  Erin Holdenried  on 

In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.

1
Fri May 29, 2015, 6:34 pm

Bamboo and CS

CS-2009 MRc6:Certified wood
posted by  Rosario Lidia Maguey Peña  on 

Hi! Is bamboo included in credit MRc6 for Core and Shell? We have a Core and Shell project in which the client wants an specific wood finish for the ceiling in the Lobby.

1
Tue Jun 2, 2015, 1:58 pm