Forum quick links
Greenroof, water retention with perlite
NC-2009 WEc1:Water efficient landscapingposted by Michela Tedeschi on
I was wondering if anyone had already used a roof garden including the perlite. Perlite is a volcanic rock effusive varying in color between gray and pink, whose chemical composition is similar to
Ventless Dryers
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Mark Gardner on
We are working on a project considering the use of ventless dryers. Has anyone ever used ventless dryers and had a problem complying with IEQc5? Thanks!
"integral to the water-proofing system"
CI-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Kathryn West on
Question about LEED Interpretations #100000699 and ID#100000700. Do these mean that the adhesive used to adhere a roofing membrane no longer falls under the scope of this credit?
Turf grass with trees
NC-2009 WEc1:Water efficient landscapingposted by Jorge Lopez de Obeso on
Good evening everyone, I had some doubts determining the species factor while filling out the credit form. The landscaped areas in our proyect includes turf grass mixed with trees.
Co2 Monitoring for Residential Project
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Sachin Shah on
Hi, We are working on a six story residential project. Each unit is cooled by ducted water source AC unit. AC unit does NOT have outside air connected to it.
90" Flat Screen TV
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Annalise Reichert on
I am working on a project that is using 90" flat screen TVs. The Energy Star product database currently does not offer any 90" Energy Star certified flat screen products (largest is about 80").
Do Indoor water seal must comply VOC requirements?
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Mauricio Ramirez on
Hello. In our project we have a large underground structure to house an IMAX Theater.
LEED EBOM
Pilot-Credits EQpc78:Design for active occupantsposted by Lukas Urban on
Hi! Can we use this Pilot-Credit in a LEED EBOM project? Our staircase meets almost all the conditions. Thank you.
LEVs and Electric Charging Stations to share a spot
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Marisa Britton on
We are doing a combined approach, with both LEVs and charging stations. Since there are not location requirements on the charging station, can it be located at an LEV parking space?
IECc6.1 Hotel Servery
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Glenn Haydu, AIA, LEED AP on
Our LEED review for the breakfast servery offered in the hotel is that we do not comply with multi-occupant spaces for lighting controls. We offered occupancy sensor with "forced off" override.