ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
Here is a major renovation project for data center. Only structure reinforcement is required for major renovation.
Low System Ventilation Efffiency for Corridors
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Todd Tewksbury on
Hi, I am conducting a ventilation calculation for the an office building that consists of open office space, conference rooms, corridors, etc.
Community Connectivity - Pedestrian Access
CS-2009 SSc2:Development density and community connectivityposted by Rachel O'Connor on
I'm creating the map for Option 2 - Community Connectivity. There are no major highways within the 1/2 mile radius and all of the services are accessible via sidewalk.
Improving thermal comfort for ski center and ice rink
NC-2009 IEQc7.1:Thermal comfort - designposted by Chen Jin on
I am dealing with a complex commercial center that contains a ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.
Heat Recovery Counts?
CS-2009 EAc2:On-site renewable energyposted by Dina Ammar on
Hello, Will the energy harvested from a heat recovery equipment installed on a chiller and/or the fresh air system in our project count towards on-site renewable energy?
Alarm to closed openings
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dears, When we have a Naturally Ventilated Space, we can use an alarm to indicate that the openings are close. Someone know if I can use an light alarm? or I must use an sound alarm?
temporary capping of the remaining duct work
CI-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Megan Bove on
If there is a project that is going to demo 1/2 of the ductwork on a floor site hich the building is keeping on the HVAC System during construction do we need to put temporary capping of the remain
Recycled Concrete for Temporary Haul Road
CS-2009 MRc4:Recycled contentposted by Ralph Bicknese on
The project is using recycled concrete, purchased from an off-site source, to construct a temporary haul road. Can this material be counted towards MRc4 for its recycled content?
existing site soils are impervious
NC-2009 SSc6.1:Stormwater design - quantity controlposted by emily reese moody on
Hello, I am fielding a question for our civil engineer.