Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How many points? Exemplary performance?

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Tiffany Moore  on 

This may be the most straight-forward question I've ever posted, but I'm frustrated. How many points are possible in IEQc4?

1
Mon Sep 21, 2015, 2:21 pm

Building footprint

NC-2009 PIf2:Project Summary Details
posted by  Andrzej Gutowski  on 

I am working on the office project and have a little hard time determining building footprint.

1
Mon Nov 30, 2015, 4:20 am

Appropriate Dust and Stockpiling Measures for Middle East

NC-2009 SSp1:Construction activity pollution prevention
posted by  Michela Tedeschi  on 

Most of the LEED projects currently constructed in the Middle East are facing serious challenges complying with EPA requirements with regards to dust suppression, stockpiling and crushing activitie

1
Tue Oct 20, 2015, 9:39 pm

View Lines in Plan

CS-2009 IEQc8.2:Daylight and views - views
posted by  Maggie Hogan Skaug  on 

What angle are view lines drawn in plan?

1
Tue Sep 22, 2015, 12:11 pm

Seasonal Public Transit

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Justin Schwartzhoff  on 

Our project is on a campus within a college town. During the time when students are active on campus (Fall through Spring), several bus lines operate within a 1/4mile of the site.

1
Fri Nov 27, 2015, 2:24 pm

Showerheads and bath

NC-2009 WEp1:Water use reduction
posted by  Daniel Vila  on 

We have a hotel where some rooms have both, showerheads and baths. One showerhead placed overhead in the bathroom, and the bath placed in the middle of the room. They have different flow-data.

1
Wed Sep 30, 2015, 2:51 pm

EAp2 "USGBC approved equivalent"

NC-2009 EAp2:Minimum energy performance
posted by  Susannah Goddard  on 

I am working on a project in the UK and the client wants to know what the alternatives are to ASHRAE 90.1 for energy modelling to demonstrate compliance with EAp2 and EAc1.

1
Tue Sep 22, 2015, 5:40 pm

Vairable flow showers

NC-2009 WEp1:Water use reduction
posted by  Nicholas Bristow  on 

We are considering using multi-flow shower heads on a commercial office project for the locker rooms.

1
Tue Sep 22, 2015, 6:18 pm

Demolished Building - Material Reuse

NC-2009 MRc3:Materials reuse
posted by  Lauren Bellamy  on 

Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.

1
Tue Sep 22, 2015, 8:48 pm

IEQc8.1 Core and Shell credit with no tenant fit out

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Shelly Christman   on 

We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.

1
Thu Mar 23, 2017, 2:17 pm