LEED C&S project on our LEED ND site
ND-v2009 GIBp1:Certified green buildingposted by Gwen Corrie on
We have an approx. 6 acre block for our ND project, on which we have an existing hotel and two new condo towers with a retail podium.
LEED Boundary
NC-2009 IEQp1:Minimum indoor air quality performanceposted by ABDUL MUTHALIB MOHAMED on
I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.
n/a
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Anastasia Makarenko on
Hello all, I am confused how to identify one product that is going to be used on a concrete slab inside our project building.
Is green space above underground parking previous or impervious?
NC-v4 SSc4:Rainwater managementposted by Valentin Grimaud on
Dear all, We are currently wondering what is th ruling in the case of an underground parking being below a green space area, which we would tend to account for in the pervious area contribution fo
Insulation of Piping Cast into Concrete
NC-2009 EAp2:Minimum energy performanceposted by André Harms on
We are working on a project where a significant amount of the domestic hot water ring feed piping will be cast into the concrete walls, and the designer is querying if these pipes will need to be i
25'-0" Max Footpath to Main Staircase
Pilot-Credits EQpc78:Design for active occupantsposted by Kelsey Jensen on
Our current project places the main staircase in view of the main lobby and corridor.
District Co generation Plantby
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Number of chillers in Energy Model
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Izumi Takayama on
Hi, I am currently preparing an energy model for a data center project (system 8).
Can this school building apply for LEED for School?
Schools-2009 MPR3:Must use a reasonable site boundaryposted by Leanne Niu on
There is a school building which has 5 floors, the project owner wants to do indoor decoration for only F1-F3 and the other two floor(F4-F5) will not be furnished.
O+M Starter Kit - Systems O+M Plan
NC-v4 INc1:Innovationposted by Kelsey Jensen on
Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?