25'-0" Max Footpath to Main Staircase
Pilot-Credits EQpc78:Design for active occupantsposted by Kelsey Jensen on
Our current project places the main staircase in view of the main lobby and corridor.
District Co generation Plantby
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Number of chillers in Energy Model
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Izumi Takayama on
Hi, I am currently preparing an energy model for a data center project (system 8).
Can this school building apply for LEED for School?
Schools-2009 MPR3:Must use a reasonable site boundaryposted by Leanne Niu on
There is a school building which has 5 floors, the project owner wants to do indoor decoration for only F1-F3 and the other two floor(F4-F5) will not be furnished.
O+M Starter Kit - Systems O+M Plan
NC-v4 INc1:Innovationposted by Kelsey Jensen on
Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?
Excluding demand for occupancy sensors in retail sales area
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Eleftherios Zacharakis on
I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.
LEED Boundary adjacent to the Ocean
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Thomas Ehrnschwender on
Project is adjacent to the Atlantic Ocean. The sand dune is protected with many native plant species and a nesting habitat for 5 different endangered turtle species.
Future Pedestrian Access
NC-2009 SSc2:Development density and community connectivityposted by Rachel Weber on
We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?
IEQ-4 Credit documentation
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Frank Burkhart on
I am hoping someone can direct me as to the best way to fill out the IEQ-4 forms given the situation. We are in a pre-bid situation filling out the LEED forms, and because it is public bid work we
Very old CI 2009 registered project - can we still certify?
CI-2009 PIf1:Minimum Program Requirementsposted by Eric Thompson on
Hi I'm helping a colleague who has a project that was registered in 2011 for LEED CI 2009 and construction completed / substantial completion in 2011.