Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

FTE calculation and use associated for visitors

Healthcare-v2009 WEp1:Water use reduction
posted by  Annabelle Lam  on 

I am working on a hospital project where I have both inpatients and visitors.

1
Mon Nov 30, 2015, 7:34 pm

LEED Online Form Help for Process Water

Retail-CI-v2009 WEp1:Water use reduction
posted by  Sara Zoumbaris  on 

Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.

0

WE Credit 4.2: Cooling Tower Water Management- non potable

EBOM-2009 WEc4:Cooling tower water management
posted by  satheesh M  on 

The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.

1
Tue Dec 1, 2015, 4:07 pm

Regularly Occupied Space Area Calculation

NC-2009 PIf3:Occupant and Usage Data
posted by  ESRA OZKONUKSEVER  on 

Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!

1
Fri Nov 27, 2015, 7:14 pm

Previous coal mine area

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Agnieszka Rylska  on 

Is a site which is located on a teritory of a previous coal mine considered perviously developed?

1
Fri Nov 27, 2015, 4:53 pm

The three dimensional orientation of the luminaire

Pilot-Credits SSpc7:Light pollution reduction
posted by  Aly Rawji  on 

Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?

0

Green Power - Carbon Offset

CI-2009 EAc4:Green power
posted by  Henry Mak  on 

Hi All, I am working on a project located in China.The owner is the local electric company who has solar power and wind power supply.

1
Wed Dec 2, 2015, 2:37 pm

right of ways adjacent to project?

ND-Plan-v4 NPDc7:Transit facilities
posted by  Ian Scott  on 

Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran

1
Mon Nov 30, 2015, 11:13 pm

Zone Heights & Voids for 90.1 PRM

CS-2009 EAc1:Optimize energy performance
posted by  Ciaran McCabe  on 

When modelling a building to the ASHRAE 90.1 PRM what conventions should be used in terms of room heights. Are floor voids and ceiling voids merged into the height of the rooms? Advise needed.

1
Tue Dec 1, 2015, 2:32 pm

Aerator pantry sink

CI-2009 WEp1:Water use reduction
posted by  H. Group  on 

We are using the Kohler faucet with 1.5 gpm aerator for pantry sink, I asked the supplier for .5gpm aerator, he said lowest Kohler offers on this faucet is 1.5 gpm.

1
Wed Dec 30, 2015, 5:36 pm