Forum quick links
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling tower water managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Regularly Occupied Space Area Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by ESRA OZKONUKSEVER on
Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!
Previous coal mine area
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Agnieszka Rylska on
Is a site which is located on a teritory of a previous coal mine considered perviously developed?
The three dimensional orientation of the luminaire
Pilot-Credits SSpc7:Light pollution reductionposted by Aly Rawji on
Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?
Green Power - Carbon Offset
CI-2009 EAc4:Green powerposted by Henry Mak on
Hi All, I am working on a project located in China.The owner is the local electric company who has solar power and wind power supply.
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran
Zone Heights & Voids for 90.1 PRM
CS-2009 EAc1:Optimize energy performanceposted by Ciaran McCabe on
When modelling a building to the ASHRAE 90.1 PRM what conventions should be used in terms of room heights. Are floor voids and ceiling voids merged into the height of the rooms? Advise needed.
Aerator pantry sink
CI-2009 WEp1:Water use reductionposted by H. Group on
We are using the Kohler faucet with 1.5 gpm aerator for pantry sink, I asked the supplier for .5gpm aerator, he said lowest Kohler offers on this faucet is 1.5 gpm.