NC-v4 MPR2:Must use reasonable LEED boundariesposted by Antje Holdefleiss on
Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?
Glass Demo
NC-2009 MRc2:Construction waste managementposted by Donald Green on
Has anyone had any luck recycling glass taken from a commercial building? They are double pane commercial units removed from the curtainwall system.
WEc1 - We don't really have a "SITE" outside of the building env
Retail-NC-v2009 WEc1:Water efficient landscapingposted by Lou Niles II on
Hello I am working on Two Separate projects that actually overlap on a site; they are not registered as Master Site or Campus and we don't want that at this time. Project A Surrounds Projects B. Pr
Existing Lighting in a TI
CI-2009 EAp2:Minimum energy performanceposted by Annalise Reichert on
I am working on a TI retrofit project that did not replace any existing lighting in their space due to budget constraints.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.
Implementing on a university campus
Pilot-Credits PC14:Walkable Streetsposted by Dee Spiro on
When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.
Minimun Energy Performance
CI-2009 EAp2:Minimum energy performanceposted by sebastian castañeda on
Greetings from Peru I am a student of which I would like to know what to do in the case of minimum energy performance of a commercial interiors when you start from scratch and there is no informat
SSc 6.1 & 6.2 Quantity and Quality control
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Victor DaCosta on
Morning, I’m starting with calculations in SS credit 6.1 and 6.2 and I have a question: We are implementing rainwater recapture on our project for irrigation and toilet flushes.
Energy Ballot passed- 4 points required under EAc1
NC-2009 EAp2:Minimum energy performanceposted by Kathryn West on
FYI This starts April 8th. http://www.usgbc.org/articles/usgbc-membership-approves-leed-2009-energy-update?kui=XTT9pgXOvaXJ97JrPRiCnQ