Forum quick links
Ergonomics Criteria Feedback
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Erin Ezell on
After applying PC44 on a recent project and seeing the subsequent 2016 updates to the pilot credit language, I wanted to share some feedback.
DCV
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I am reading Section 6.2.7 ASHRAE 62.1-2010, and it is not clear to me if the building needs to install DCV.
n/a
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Anastasia Makarenko on
Our project is a big confectionary plant situated in Russia.
ieqc8.1 x ieqc 8.2
NC-2009 IEQc8.2:Daylight and views - viewsposted by GISELA FARHAT DE ARAUJO on
to achieve this credit we must have won the ieqc8.1 credit? or credits are independent?
water bills received every 3 months
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Agnieszka Rylska on
Our project receives water bills including water usage every 3 months.
BAS
EBOM-2009 EAc3.1:Performance measurement - building automation systemposted by VISHESH AGARWAL on
Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.
Pilot Credit 101
Pilot-Credits EQpc78:Design for active occupantsposted by Kiyomi Kurooka on
This was the first time our office participated in a Pilot Credit.
CI - applicable when the tennant is the owner?
CI-2009 MPR1:Must comply with environmental lawsposted by Tom Kennedy on
The language of The Reference Guide and MPR's don't seem to quite come out and make this clear; so I figured I would just ask - - suppose a company owns a building, lives and works in that buildin
Energy model OA report
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
If a zone has a large exhaust fan which the exhaust rate is greater than the OA intake at the AHU (the rest of OA will be transferred from other zones , make up air, or infiltration).
Kitchen Energy Model
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
In the normal case for baseline system 5-8, does a kitchen must be modeled as a separated HVAC system using system 3-4.