NC-v4 EQc2:Low-emitting materialsposted by Mike Miller on
Has USGBC taken into consideration the overlap for the Low-Emitting Materials categories with v2009 (NAUF) and v4 General Emission Standard (GES) and whether or not they would allow the GES certifi
Carpool Requirement
NC-v4 LTc7:Reduced parking footprintposted by Sarah Nugent on
Hi There, We're working on a high rise condo in Manhattan that is providing very limited parking (18 spaces for 330 residents).
Air-supply plenum
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Gustav Alfaro on
For an office application we have an air-supply plenum for conditioning the space, what is the maximum content of VOC allowed for the plenum sealing material? Thanks in advance.
CONFUSED IN EAP2 STRATEGY FOR A MASTER SITE PROJECT
NC-2009 EAp2:Minimum energy performanceposted by VEL MUTHU on
Hello everyone, I am currently working on a project which consist of 8 buildings(3 main buildings and 5 supportive building, all are between 8000 to 60,000 sq ft), we are targeting certification le
minimum area requirement for energy modelling
NC-2009 EAp2:Minimum energy performanceposted by VEL MUTHU on
do we have any area requirement for energy modeling i.e. Minimum area to opt for Option 1 Whole building energy modeling aproach for EAP2?
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?
Bus service in opposite directions
Healthcare-v4 LTc5:Access to quality transitposted by Bryan Finnegan on
The credit requires "Qualifying transit routes must have paired route service (service in opposite directions)" We have two transit routes that run within the required distance of an entry, but th
District Central plant heating only
NC-2009 EAp2:Minimum energy performanceposted by Vipul Babriya on
I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.
Glass Canopy over new concrete
NC-2009 SSc7.1:Heat island effect - nonroofposted by Haley Duncan on
Hello, I have a similar question to the post labeled " Glass Canopy over Compliant Hardscape." We have a glass canopy over new concrete. Can I count this area as compliant?
Required parking lots and LEED boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s