Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Relevant Trades/Contractors at Project Planning Stage

Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workers
posted by  Charles Boechler  on 

From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ

0
4
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Wed Aug 16, 2023, 6:06 pm

Interior element reuse in different project

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Nadia Azzam  on 

Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).

0

Minimum Survey respond reached but no score avilable

EBOM-v4.1 LTp1:Transportation Performance
posted by  Michael Ling  on 

Good Day ! I would like to ask if anyone experienced that before: 

2
Associate Director of Asset Certification Services
Longevity Partners
LEEDuser Expert
0 thumbs up
Wed Aug 16, 2023, 3:29 pm

Water Calcultion for Commerical ID+C project

CI-v4 WEc1:Indoor water use reduction
posted by  Amgad Khattab  on 

We have a project with the following :

- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.

Hint:

1
Thu Aug 17, 2023, 6:03 pm

Lighting Control - Recording Studio

CI-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After

0

Option 2. Prescriptive Compliance

CI-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

kinda embarrassed to ask this one, but here goes...

6
Energy/Sustainability Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 15, 2023, 3:51 pm

Furniture

NC-v4 MRc5:Construction and demolition waste management
posted by  Alexandra Kravel  on 

We are working on a partial renovation for a college building.

0

Furniture

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Alexandra Kravel  on 

We are working on a partial renovation for a college building.

0

Passive Survivability and Back-up Power During Disruptions

NC-v4 INc1:Innovation
posted by  Ridhwan Omar  on 

Hello LEEDUsers!

We have a resort hotel project in one of the islands in Micronesia.

6
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Mon Aug 14, 2023, 5:28 pm