Forum quick links
Brownfield remediation
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).
Financial donation
NC-v4 SSc2:Site development - protect or restore habitatposted by Florian Schmidtchen on
Dear all, As we all know it is possible to get ‘Exemplary-Performance-Points’ by double the appropriate credit requirements.
Are basement walls included in envelope calculations
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Stacey Olson on
I understand the floor slab of basements is allowed to be included; what about the envelope?
Where to include stairs?
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Stacey Olson on
I don't see it mentioned in the Reference Guide for either MRc1.1 or MRc1.2, although I would think it was fall under MRc1.1. Thank you.
Water Use Reduction Baseline for Renovation
NC-2009 WEp1:Water use reductionposted by John Krutko on
My office is working on a school renovation registered under LEED v2009 NC.
Pilot Credit Closed 12/5 - Available in the Innovation Catalog
Pilot-Credits EQpc78:Design for active occupantsposted by Batya Metalitz on
This pilot credits was closed on 12/5/2016 and moved to the Innovation Catalog for continu
Modeling HVAC for future un-designed office space
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.
Site Selection
Healthcare-v2009 SSc1:Site selectionposted by Lan Le on
Please let me know the LEED credit or pre-requisite for selecting site that will have least environmental impact. thank you
Trying to get EQc1 without installing a visible alarm
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Ira Ben-Reuven on
We are working to certify a NC. The tenants will not allow us to install a alarm in the presence of the customer.
100% OA constant volume enthalpy heat recovery ventilator
NC-v4 EQp1:Minimum indoor air quality performanceposted by Noriko Nagazumi on
Hi, Our project is mechanically ventilated by 100% OA constant volume enthalpy heat recovery ventilator.