Forum quick links
Major renovation with re-insulation of external walls and roofs
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Qian Tang on
Dear All, I´m working on a major renovation project. All the external concrete walls, roofs and pillar should be maintained but the insulation layer above the concrete will be changed with the bett
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m
No mention of Private offices
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.
SS - EM
NC-2009 EAc1:Optimize energy performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
documentation
NC-v4 MPR1:Must be in a permanent location on existing landposted by sepideh khodadadi on
i am working on a big project and have absolutely no experience in LEED .
Which version of LEED forms to use.
NC-2009 IEQp1:Minimum indoor air quality performanceposted by VEL MUTHU on
We are working on a project which was registered under V3 on 2015 and still running. My doubt is the the online form is updated from version to version.
LEEDv4 compliant operable partitions?
NC-v4 EQc2:Low-emitting materialsposted by Joanna Switzer on
Has anyone had luck in locating CPHv1.1-2010 tested (or alternately Green Guard Gold certified) operable / folding (CSI Division 10) partitions? As a general observation, I am concerned numerous s
How to define affordable housing : rental and for-sale
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?
PC 112 Calculating costs
posted by Maki San Miguel Paulson on
The requirement is to use 25% by cost, of the total value of permanently installed products in the project.
Converting Inches to volume of rainfall
EBOM-2009 SSc6:Stormwater quantity controlposted by Mihir Parikh on
Does anyone have an accurate way of converting total inches of rainfall to cubic feet as required by the credit?