Forum quick links
Basic Difference between LEED V3 & LEED V4
NC-v4 MPR1:Must be in a permanent location on existing landposted by Subrota Roy on
What is Basic Difference between LEED V3 & LEED V4 ? What things has been incorporated in LEED V4?
Low Emitting Products
Homes-v4 EQc7:Low-emitting productsposted by Jess Harris on
Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.
Doubts in Green power & REC
NC-2009 EAc2:On-site renewable energyposted by SAMY Chamy on
Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the
EA Credit 2
NC-2009 EAc2:On-site renewable energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Water Use Reduction
Schools-2009 WEc3:Water use reductionposted by Karly Michalowski on
I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!
Roof for School
Schools-NC-v4 EQc2:Low emitting materialsposted by Josh Inge on
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?
Joint Compound
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?
VRF System Computation
NC-2009 EAc4:Enhanced refrigerant managementposted by Katherine Mariano on
Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a