Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Basic Difference between LEED V3 & LEED V4

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Subrota Roy  on 

What is Basic Difference between LEED V3 & LEED V4 ? What things has been incorporated in LEED V4?

1
Sat Aug 26, 2017, 12:45 pm

Low Emitting Products

Homes-v4 EQc7:Low-emitting products
posted by  Jess Harris  on 

Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.

1
Sat Aug 26, 2017, 2:40 pm

New and Renovation: How to Determine Points from Table 1

NC-v4 EAc2:Optimize energy performance
posted by  James Keohane  on 

I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.

1
Fri May 26, 2017, 1:46 pm

Doubts in Green power & REC

NC-2009 EAc2:On-site renewable energy
posted by  SAMY Chamy  on 

Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the

1
Fri May 26, 2017, 3:24 pm

EA Credit 2

NC-2009 EAc2:On-site renewable energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Water Use Reduction

Schools-2009 WEc3:Water use reduction
posted by  Karly Michalowski  on 

I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!

1
Sun Aug 27, 2017, 12:14 am

Roof for School

Schools-NC-v4 EQc2:Low emitting materials
posted by  Josh Inge  on 

If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?

0

Joint Compound

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Michele Helou  on 

Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?

0

VRF System Computation

NC-2009 EAc4:Enhanced refrigerant management
posted by  Katherine Mariano  on 

Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!

1
Tue Jun 6, 2017, 3:25 pm

EPDM tile and Wood Porch

Schools-NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a

1
Wed Jun 21, 2017, 2:53 pm