NC-2009 IEQc8.2:Daylight and views - viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
R-Value for wall assembly
NC-2009 EAp2:Minimum energy performanceposted by Sunil S on
I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti
Budget Method
NC-v4 EQc2:Low-emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Conflict of interest?
NC-v4 EQc4:Indoor air quality assessmentposted by emily reese moody on
Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?
Railway station
ND-v2009 NPDc7:Transit facilitiesposted by Noriko Nagazumi on
Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.
Mixed Mode Ventilation for Apartment Kitchens
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Neil Sen on
We are designing apartments with mixed mode ventilation--the areas within 25 feet of a window will be naturally ventilated and the rest of the dwelling units will be mechanically ventilated.
Existing Chillers in Basement (not in project boundary)
CI-v4 EAp3:Fundamental refrigerant managementposted by Heather Zeto on
Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).
Exemplary performance documentation
NC-2009 MRc2:Construction waste managementposted by Kavita K on
Working on a project which is using NC 2009 version. We have to submit for construction preliminary review, We have achieved 97% const.
Project using EApc67 for Minimum and Optimize Energy Performance
Pilot-Credits EApc67:Energy Jumpstartposted by Greg Romanczyk on
We've registered for EApc67 for our LEED O+Mv4 project.