NC-v4 EAp1:Fundamental commissioning and verificationposted by P. Hardy on
In LEED v4, the CxA for Enhanced Commissioning must be independent of the design and construction team- but what if the construction team is also the owner, as in design-build?
Industrial Maintenance and Dry Fog
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Celimar Fournier on
What is the VOC Limit for Industrial Maintenance and Dry Fog?
Paints and French legislation label
NC-v4 EQc2:Low-emitting materialsposted by Maria Matos on
Hi, We are assessing a building in Portugal and, to comply with this credit regarding the paints, we have found products which have the french legislation label, with A+ rating.
Credits from other Rating Systems
NC-v4 INc1:Innovationposted by Meredith Elbaum on
In V3, USGBC had a list of credits from other rating systems that could be innovation credits. For instance EBOM Green Cleaning. Does a list exist for V4.
Efficient Hot Water Distribution testing protocol
Homes-v4 EAc2:Efficient hot water distribution systemposted by Ryan Moore on
Efficient Hot Water Distribution System, Option 2, Case 1 states "no more than 0.6 gallons (2.3 liters) of water is collected from the hot water fixture before hot water is delivered." What specif
Implementing IAQ testing shell space
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Summer Minchew on
Noting that an equivalent to IEQc3.2 is not available within the LEED-CS rating system, is it safe to assume that future tenant space(s) within a LEED-NC project would not be subject to IAQ testing
ID and exemplary performance?
EBOM-2009 IEQc3.3:Green cleaning - purchase of sustainable cleaning products and materialsposted by cristina algaze beato on
We're pursuing one points on this credit as Innovation in Design for a LEED-CI 2009 project. Can we achieve an exemplary performance point too?
EnergyStar Reporting
NC-2009 EAc5:Measurement and verificationposted by Karl Heitman on
Our project is registered under LEED 2009, and my Reference Guide doesn't show Option 3. Is the Option 3 new? Is it for exemplary credit only?
Process Loads
NC-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello, I am modeling a Winery, where most of the chillers and boilers are used for process tasks. I am using HAP to model this building, and I have this questions regarding the best way to model th
Energy modeling for LEED BD+C: Core & Shell
NC-v4 EAp2:Minimum energy performanceposted by Hanh Truong on
Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?