Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Air testing related to partial renovation per floor

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Julie Barth  on 

I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.

4
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Sat Mar 11, 2017, 12:44 am

Help with LEED ND

ND-Plan-v4 MPR1:Must be in a permanent location on existing land
posted by  T J  on 

I'm a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including chec

7
Default Avatar
LEEDuser Basic Member
0 thumbs up
Thu Mar 9, 2017, 7:11 pm

Laboratory

NC-v4 WEp2:Indoor water use reduction
posted by  Vanessa Montezuma Ramos  on 

My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Mar 9, 2017, 3:13 pm

FTE is linked to IEQc6.1 and IEQc6.2 - Healthcare buildings

NC-2009 IEQc6.2:Controllability of systems - thermal comfort
posted by  VICTOR MORENO  on 

In our Healthcare project, there are different workers during the morning, afternoon and evening, with a time of 8 hours each. If I count the FTE, I get a total of workers greater to the number of

4
Green Building Energy Consultant
Green Living Projects
LEEDuser Basic Member
2 thumbs up
Thu Mar 9, 2017, 12:10 am

Entry way systems

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Kerry Honsinger  on 

I read recently in a thread that someone was claiming Entry Vestibules are required. Nowhere in the reference guide am I reading this.

3
Default Avatar
Reynolds Ash and Associates
LEEDuser Basic Member
5 thumbs up
Mon Mar 6, 2017, 9:29 pm

Exhaust rate in retail units.

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  VEL MUTHU  on 

I am currently working on a project which has 6 retail outlets in a very big building for the users in that building.

4
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Mar 6, 2017, 12:08 pm

Number of task lighting in a travel center.

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  VEL MUTHU  on 

I am working in a project where there is a travel center room i.e. an area where people get travel related information.

2
Fri Mar 3, 2017, 7:01 pm

City Bikeshare Program

CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing rooms
posted by  Lauren Hunt  on 

We are working on a LEED-CI project close to several city bike share stations. These are city provided bikes that can be checked out and returned to any bike share station.

3
Architect, LEED AP BD+C
Livet Consulting
LEEDuser Basic Member
0 thumbs up
Fri Mar 3, 2017, 2:39 pm

Filling the Minimum Performance Calculator for 100% OA

EBOM-2009 IEQp1:Minimum indoor air quality performance
posted by  Rasita Masalskyte  on 

SIngle 100% outdoor air AHU is serving multiple zones (through diffusers) on couple of floors in a highrise office building.

4
Metricorps LEED Expert
EUA
LEEDuser Expert
511 thumbs up
Fri Mar 3, 2017, 10:27 am

Colored surface hardener in Powder form (Cement based)

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Mario S.  on 

We are working on a project that will install terrazzo and polished concrete flooring.

4
Thu Mar 2, 2017, 3:25 pm