CI-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:- Greetings Currently we are working in LEED CI - office project The Building served with 5 no VRF and 2 no of Split A/c so we consider 7 no of systems so we have clarifications in m
hand dryers
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by mariela garate on
(this question is for 2.1 electric-power equipment) Does the use of an efficient hand dryer contribute to this or other credits? The company claims contribution to credits of Energy performance, a
How to upload addition documents under MRc1 credit
CS-2009 MRc1:Building reuse - maintain existing walls, floors and roofposted by Catharina B on
Hi All During the preliminary construction review this credit had been denied, after our "claim" we got explanation that the project team is correct and we shall provide a copy of this corresponden
Scope of system performance testing
CI-2009 EAp1:Fundamental commissioning of building energy systemsposted by Billy Condor on
I have two questions regarding Cx activities for a LEED CI proyect: 1.
IEQc5
Schools-2009 IEQc5:Indoor chemical and pollutant source controlposted by Nate Maniktala on
What does the Average Pressure Differencial mean and where would I find that info on the plan set for this credit? Thanks!
Recycled vs Certified
NC-2009 MRc7:Certified woodposted by Martin Meehan on
We have a particleboard door blank that has 90% recycled content. It is also FSC Mix 85%. Let's say we document this product under MRc4 Recycled Content, considering that double dipping is not all
Demolition of Interior Wall
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
The reference guide states that if a wall is demolished and not replaced, it can be excluded from the calculations. Please define 'REPLACED' and 'NOT REPLACED'...
Points possible for IAQ Assessment
NC-v4 EQc4:Indoor air quality assessmentposted by Joanna Ruiz on
I am seeking the two points for the IAQ Assessment by doing the Air Testings. Am I seeking impossible points if the project does not include the point for Low-Emitting Materials?
Blackening process for steel?
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Michelle Bombeck on
A project of ours is specifying blackened steel for some of the steel in our building.
Generic or Product-specific EPD ?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ana García on
Dear All, An international insulation manufacturer has developed an EPD for all its products consisting in rock wool insulation.