Forum quick links
Integrative Process-Value Engineering
Pilot-Credits PC60:Integrative Processposted by Susan Coy on
Do you use Value Engineering in documenting this process?
Using v4 requirements on a v3 project
NC-v4 LTc4:Surrounding density and diverse usesposted by Brightworks Sustainability on
Our project is hoping to use the v4 criteria (diverse uses) to meet the requirements for a v3 project.
margin
NC-2009 IEQc8.1:Daylight and views - daylightposted by Francesco Passerini on
In DesignBuilder for the daylight simulation you have to impose a value for the parameter "margin", which is defined in the following way: Enter the margin (in m or ft) around the zone boundaries w
Pursuing option 2, path 2
CS-2009 WEc1:Water efficient landscapingposted by Andrey Kuznetsov on
Dear colleagues, maybe my question will be stupid, but I hadn't found a strict answer, so I'm a little bit confused. We have a project that has no permanent irrigation system, only a has a hose bi
Achieving credit using TSS concentrations
NC-2009 SSc6.2:Stormwater design - quality controlposted by Manuel Martin Delgado on
Hello, I would like to get confirmation on whether the following approach of demonstrating compliance with LEED requirements could be accepted or not.
Recycled Content Percentages
NC-2009 MRc4:Recycled contentposted by Jace Christensen on
I am calculating the percentage of materials that contain recycled content. It says MEP type work is not to be included in the calculation.
Visitor Count - Dormitory
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by Todd Bundren on
We received our preliminary design review comments back and were asked to include a daily average visitors number. Our average users value is 3, peak users value is 27, and the FTE value is 3.
Updated SF Pesticide Hazard Screening List
EBOM-2009 IEQc3.6:Green cleaning - indoor integrated pest managementposted by Trista Brown on
Heads up that an updated list came out in September 2013 and can be accessed here - www.sfenvironment.org/sites/default/files/fliers/files/sfe_th_pesticides_reviewed_091313.pdf We'll be updating
Meeting the 5% landscape requirements with planters
NC-2009 WEc1:Water efficient landscapingposted by Rahul Yadav on
Hi, The credit says that for applying the points, minimum 5% of the site area shall have planters, garden etc. Does the potted plants are counted under planters.
Renewable Energy in Template EAp2 (Healthcare)
NC-2009 EAp2:Minimum energy performanceposted by VICTOR MORENO on
Hello.