Perimeter protection

NC-2009 SSp1:Construction activity pollution prevention
posted by  Martin Meehan  on 

We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S.

3
Default Avatar
Principal
Meehan Associates
LEEDuser Basic Member
14 thumbs up
Thu Feb 11, 2016, 6:22 pm

Base Build HVAC Plant Requirements

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Ciaran McCabe  on 

Hi, I am working on a CI 2009 fit out where the the landlord services such as heating pumps, boilers, AHU's and chillers are already installed.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Feb 11, 2016, 5:41 pm

SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Shad Traylor  on 

SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Thu Feb 11, 2016, 12:47 am

Open Space Accessibility

NC-2009 SSc5.2:Site development - maximize open space
posted by  Ilana Judah  on 

We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.

3
Wed Feb 10, 2016, 3:25 pm

Amount of offset in multi tenanted building

EBOM-2009 EAc4:On-site and off-site renewable energy
posted by  Peter Doo  on 

If tenants are individually metered, are the percentages of offset calculated on common area meter usage only?

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Tue Feb 9, 2016, 6:51 pm

New ASHRAE compliance path

NC-2009 EAp2:Minimum energy performance
posted by  Paula Melton  on 

Is this new compliance path likely to have any effect, direct or indirect, on prereq/credit documentation?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Feb 8, 2016, 5:34 pm

Underground Storage Chambers

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Marco Valerio Ceccotti  on 

To reduce runoff peak and quantity our project team used an embedded underground chambers system.

3
Mon Feb 8, 2016, 2:59 pm

demolition of existing facade

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

Some years ago the facade of an existing building was demolished. The facade was completely glazed. The structure of the building (pillars, beams) was conserved.

3
Fri Feb 5, 2016, 8:18 pm

Process Energy Exceptional Calculation

NC-2009 EAp2:Minimum energy performance
posted by  Maya Karkour  on 

Hello, we are considering attempting the exceptional calculation method allowed in Section G2.5 for process load savings on a hospital project: the design is proposing equipment sterilization throu

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Feb 5, 2016, 8:15 pm

Pump Room, STP Room & Guard Room Within LEED Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aswin M  on 

We have a factory project to be registered under LEED New Construction.

3
Fri Feb 5, 2016, 9:41 am