Forum quick links
preconsumer recycled content in steel
NC-2009 MRc4:Recycled contentposted by Osama Hassan on
How steel industries produce a waste that considered as a pre-consumer?
If the ventilation of kitchens in hotel should be included in
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Leanne Niu on
A hotel project that the kitchens have independent ventilation and outdoor air system , whether the ventilation of kitchens should be included in the calculation?
VOC content for Shop applied finishes
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Jeremy Mendenhall on
We are new to the Leed program and wanting to make sure that we are following all of the guidelines, we have received some instruction however I'm trying to get confirmation that shop applied fini
Commingled Waste Diversion
EBOM-2009 MRc9:Solid waste management - facility alterations and additionsposted by Michelle Rosenberger on
I see nothing in this credit that discusses commingled diversion methodologies or requires monthly diversion rate backup from facilities like the NC rating system.
Floor Coating that Exceeds VOC Limit
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Amanda Atkinson on
We have two CS v2009 projects in which a single epoxy floor coating exceeds the allowed VOC content. All other flooring products and coatings are compliant.
What if only 2 of 3 stairwells meet daylighting requirement?
Pilot-Credits EQpc78:Design for active occupantsposted by Steve Loppnow on
In a multi-family project, we have 2 of 3 stairwells that meet the daylighting requirement. Would we still be able to claim credit for the daylighting option, as 1 of our 7 features?
Option 2 for submetered irrigation
EBOM-v4 WEc1:Outdoor water use reductionposted by Charalampos Giannikopoulos on
If we install subsystem metering for the irrigation systems to comply with WE credit Water Metering can we still select Option 2 (No irrigation meter installed: Calculated water budget).
Occupant Comfort Survey - draft from LEED User
EBOM-2009 IEQc2.1:Occupant comfort - occupant surveyposted by Oana Stamatin on
We used with success in the past the Template for Occupant Comfort Survey from Resources tab, but for our fifth project the following GBCI comment was received: "The survey does not appear to addre
VOC Budget shortcut?
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Rick Farrell on
We are a wood floor contractor who often does site finished wood floors on commercial LEED projects, mostly in Texas. The water based urethane we use states the following on the MSDS VOLATILE ORGAN
calculating shipping costs for multiple items
NC-2009 MRc4:Recycled contentposted by Amy Blizzard on
I can't find how to factor in shipping for multiple items. For example, under the MRc4 - I have four items from one company, so the four will be shipped together.