Permanent Irrigation System, Temporary Use of Potable Water

NC-2009 WEc1:Water efficient landscaping
posted by  Daniel Costantino  on 

Hello, I am working on a project where there will be a permanent irrigation system.

5
Thu Apr 16, 2015, 9:26 pm

Open Floor Plan with different Tvis Values

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Marisa Britton  on 

Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a Tvis of 38% and the South + East glazing walls have a Tvis of 56%?

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 16, 2015, 6:24 pm

Future Expansion

NC-2009 SSc5.2:Site development - maximize open space
posted by  Karl Heitman  on 

Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings.

2
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Thu Apr 16, 2015, 4:45 pm
4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Apr 16, 2015, 1:53 am

ASHRAE standard

NC-2009 EAp2:Minimum energy performance
posted by  Nelina Loiselle  on 

Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Apr 15, 2015, 6:46 pm

Baseline System Type for Hotels

NC-2009 EAp2:Minimum energy performance
posted by  Sandra Holmström  on 

Hi, I am wondering what Baseline System Type should be used for hotels?

3
Default Avatar
environmental consultant
Bengt Dahlgren AB
LEEDuser Basic Member
1 thumbs up
Wed Apr 15, 2015, 2:59 pm

Fundamental Commissioning Rainwater Harvesting System...

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Rick Alfandre  on 

Our current project will have a rainwater containment system that will be connected to our domestic water supply to provide water for toilet flushing and irrigation.

3
Wed Apr 15, 2015, 2:26 am

Separate MEP CxA and BECxA

NC-v4 EAc1:Enhanced commissioning
posted by  Annalise Reichert  on 

I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.

3
Wed Apr 15, 2015, 2:22 am

Consistent SF throughout project

CI-2009 EAp2:Minimum energy performance
posted by  Stacey Olson  on 

I've recieved comments on a past project that said all square footages must be consistent throughout the project - so the SF documented in MPR 2 must be the same as EAp2 and WEp1. I'm working on a

3
Tue Apr 14, 2015, 7:20 pm

Typo in DES v2?

NC-2009 EAp2:Minimum energy performance
posted by  Haojie Wang  on 

To calculate the virtual rate, DES v2 option 1 2.4.2.1 gives the equation of $/MBTU of hot water = 1.59*$/MBTU fuel + 3 * $/kWh electricity. This would gives me a really big number.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue Apr 14, 2015, 5:53 pm