Permanent Irrigation System, Temporary Use of Potable Water
NC-2009 WEc1:Water efficient landscapingposted by Daniel Costantino on
Hello, I am working on a project where there will be a permanent irrigation system.
Open Floor Plan with different Tvis Values
NC-2009 IEQc8.1:Daylight and views - daylightposted by Marisa Britton on
Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a Tvis of 38% and the South + East glazing walls have a Tvis of 56%?
Future Expansion
NC-2009 SSc5.2:Site development - maximize open spaceposted by Karl Heitman on
Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings.
What is the acceptable testing standard for runoff coefficient.
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Panupant Phapant on
Dear All We are the construction materials manufacturers.
ASHRAE standard
NC-2009 EAp2:Minimum energy performanceposted by Nelina Loiselle on
Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used?
Baseline System Type for Hotels
NC-2009 EAp2:Minimum energy performanceposted by Sandra Holmström on
Hi, I am wondering what Baseline System Type should be used for hotels?
Fundamental Commissioning Rainwater Harvesting System...
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Rick Alfandre on
Our current project will have a rainwater containment system that will be connected to our domestic water supply to provide water for toilet flushing and irrigation.
Separate MEP CxA and BECxA
NC-v4 EAc1:Enhanced commissioningposted by Annalise Reichert on
I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.
Consistent SF throughout project
CI-2009 EAp2:Minimum energy performanceposted by Stacey Olson on
I've recieved comments on a past project that said all square footages must be consistent throughout the project - so the SF documented in MPR 2 must be the same as EAp2 and WEp1. I'm working on a
Typo in DES v2?
NC-2009 EAp2:Minimum energy performanceposted by Haojie Wang on
To calculate the virtual rate, DES v2 option 1 2.4.2.1 gives the equation of $/MBTU of hot water = 1.59*$/MBTU fuel + 3 * $/kWh electricity. This would gives me a really big number.