How to incorporate 15%?

CS-2009 EAc6:Green power
posted by  Melissa Wrolstad  on 

For Core and Shell, in the reference guide and various other LEED resources I’ve been looking through - it appears that for LEED-CS projects it’s possible to take 15% of the annual electricity (fro

3
Default Avatar
Senior Project Manager
CodeGreen Solutions
LEEDuser Basic Member
157 thumbs up
Wed Feb 4, 2015, 3:46 pm

C&S base building electricity use

CS-2009 EAc6:Green power
posted by   Habitech Distretto Tecnologico Trentino  on 

Our C&S project includes in the LEED Project Boundary: (1) UNDERGROUND PARKING GARAGE AND EXTERIOR SPACES (BASE BUILDING) (2) commercial spaces (tenant spaces), which correspond to the 100% of

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Feb 4, 2015, 3:45 pm

Complex occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  study topenergy  on 

There is a data center with a complex occupancy (2 shifts). Day shift is 9 hours, 8:30-17:30; night shift is 15 hours, 17:30-8:30. There are 3 persons per shift.

2
Wed Feb 4, 2015, 6:34 am

Parking spaces

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Roberto Meza  on 

In one of our projects (a bank branch) we have 4 parking spaces out of parking lot, only for employees, these 4 spaces are separated of the parking lot by a gate and they are not available for the

2
Tue Feb 3, 2015, 5:11 pm

Installing CO2 devices in non-densely occupied spaces

NC-2009 IEQc1:Outdoor air delivery monitoring
posted by  Marina Andrade  on 

To comply if the requirements of this credit, could we installed CO2 devices, instead of outdoor airflow mesurement device, in non-densely occupied spaces?

4
Project Manager
New Buildings Institute
LEEDuser Basic Member
1 thumbs up
Tue Feb 3, 2015, 10:48 am

"Preferred" Parking = reserved, cannot be used by others?

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Eric Thompson  on 

I have a project where we only have 3 parking spaces provided, resulting in a substantial reduction from the baseline. However, the client is reluctant to reserve these exclusively for carpools/va

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Tue Feb 3, 2015, 6:51 am

Low-temperature chemical dishwashers

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Susan Di Giulio  on 

The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Feb 2, 2015, 4:40 pm

DES Option 2 – CHP with absorption chiller

NC-2009 EAc1:Optimize energy performance
posted by  Qian Tang  on 

Hello, We are working on a LEED NC 2009 project with DES which the thermal plants consist except boilers and electric chillers also a cogenerator and an absorption chiller. We are thinking to follo

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Feb 2, 2015, 10:47 am

Footprint, at grade or below grade?

NC-2009 PIf2:Project Summary Details
posted by  Maria Porter  on 

Hi! I have a question similar to the one posted on Nov 18 2013 below.

2
Mon Feb 2, 2015, 7:10 am

Distributors location for MR c5

NC-2009 MRc5:Regional materials
posted by  María Fernanda Aguirre  on 

Hi there! Regarding regional materials do distributors facilities need to be counted within the 500 miles radius?.

5
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Fri Jan 30, 2015, 11:28 pm