Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Audio Visual Equipment part of prerequisite?

CI-2009 EAp2:Minimum energy performance
posted by  Saju Varghese  on 

Does audio visual equipment need to be included into the appliances requirements including projectors, speakers, led display, interactive displays, etc?

5
Thu Apr 3, 2014, 11:08 pm

LEED baundary

CS-2009 PIf1:Minimum Program Requirements
posted by  gabriel Morales  on 

Our project is located in an area with 3 additional towers (one residential offices and 2), the parking lot of our office tower with LEED certification, has its parking in basements 3, 4 and 5, whi

3
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Apr 3, 2014, 9:42 pm

Carpet tile approved as acceptable walk-off mat

EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source control
posted by  Melissa Vernon  on 

Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w

2
Thu Apr 3, 2014, 4:50 pm

Getting "enough" air into little-used corridors

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Rob Watson  on 

I'm working on the certification of a completed project in Russia.

3
CEO
ECON Group
LEEDuser Basic Member
126 thumbs up
Thu Apr 3, 2014, 4:12 pm

LEED-NC Building Within New Complex

NC-2009 SSc2:Development density and community connectivity
posted by  Ali Kassid  on 

We are working on the design of a new Campus comprises 5 faculties along with 14 buildings including residential, public, and ancillary facilities.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Apr 3, 2014, 6:16 am

MRc3-Working Product Sustainablity Criterias without cutsheets

EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additions
posted by  Trunnell Levett  on 

I am working on MRC3 tracking and documentations without available cut sheets-just purchasing receipts.

2
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Thu Apr 3, 2014, 1:43 am

Process Energy

NC-2009 EAc1:Optimize energy performance
posted by  John McCullough  on 

Hi I am using option 1 a computer simulation model to carryout the calculations. I am trying to get the additional points for demonstrating the cost reduction in Process energy.

3
Wed Apr 2, 2014, 7:35 pm

Overlapping LEED boundaries - Future development

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Becky Dix  on 

I posted this in the PIf1 forum before seeing this one. I tried to delete it there, but couldn't see how.

2
Wed Apr 2, 2014, 6:53 pm

BAS localized lighting

EBOM-2009 EAc3.1:Performance measurement - building automation system
posted by  ethan adams  on 

Motion sensors seem to be a natural, low-cost localized lighting control for this credit except for this one line: "Demonstrate that the BAS is being used to inform decisions regarding changes in b

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Apr 2, 2014, 3:07 pm
3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Wed Apr 2, 2014, 1:44 pm