CS-2009 IEQp1:Minimum indoor air quality performanceposted by Ron Dean on
I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.
LEED CI 2009 M&V metering requirements
CI-2009 EAc3:Measurement and verificationposted by Patrick Salmon on
Our company is in the process of determining whether a commercial interiors project is ideal for the EAc3 submetering option for Case 1.
Tenant space fan & pump sizing
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Mike D on
We are a bit confused as to the meaning of space fan and pump sizing? Could anyone please offer some clarification? Thanks!
Air flow measurement for non densely occupied zones
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Magda Aghababyan on
Dear Sir/ Madam, I have a project that is a hotel with 200 guest rooms that are non-densely occupied. Each guest room floor (20 rooms per floor) is supplied with 3 AHUs.
Metering domestic hot water for kitchen - exemplary point in WEc
EBOM-2009 WEc1:Water performance measurementposted by Tom Kennedy on
Our project is a large office building with commercial kitchen (in house breakfast/lunch, etc).
ASHRAE forms for vrv systems
CI-2009 EAp2:Minimum energy performanceposted by Yaser Al Sharif on
Our System is VRV , and the hvac Ashrae forms - part 1 and 2 - does not comply with vrv system - how we could comply with them and many of them does not comply with vrv system ???????????
CO2 sensors in Residential Project
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Ilana Judah on
We have a large residential project that has natural ventilation being used. Are CO2 sensors required in every room/bedroom of the apartments?
Using a newer version of 90.1 than what LEED specifies
NC-2009 EAp2:Minimum energy performanceposted by Dave H on
I am working on a project that was registered under LEED NC 2.2. Will the USGBC allow us to apply requirements from 90.1 - 2010 to the project instead of 90.1 - 2004?
Owner Furnished Task Lighting
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Ryan L on
Under ASHRAE 90.1-2007 task lighting must have automatic shutoffs; the owner prefers not to install occupancy sensors/shutoffs at individual workstations.
option 2. views
EBOM-2009 IEQc2.4:Daylight and viewsposted by Brian Dougherty on
I am trying to calculate the requirements and was wondering about some technical details. This is for a library on a college university. 1. Does the window sill have to be between 30-90"?