Forum quick links
On-site duct manufacture
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Mauricio Ramirez on
Hi. One of the projects in which I'm involved will have on-site HVAC duct manufacture. Does this practice has any inconvenient for the compliance with the credit IEQc3.1?
100% OA SYSTEM?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Weidong Luo on
an AHU with no return air supplies 100% OA to an office and a conference room with FCUs, the OA supply ducts connected to the FCU supply ducts.
Hexavalent Chromium on groundwater
NC-2009 SSc3:Brownfield redevelopmentposted by eirini matsouki on
Hi all, Our project is international and is under construction. We are keeping this credit on a stand-by, as during the design submission there was not any evidence of contamination.
MINIMUM IAQ AND FTE
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
I have had this doubt from a long time, is the occupancy assumed for IEQ calculations related to FTE?, and if so, in which wa?, Thank you
LEED Documentation for Steel Subcontractor
NC-2009 MRc4:Recycled contentposted by Shaunna Shaw on
I work for a construction company that does steel fabrication and erection.
ASTM tests for BECx
Healthcare-v2009 EAc3:Enhanced commissioningposted by Alicia Villanueva on
Hallo, we are trying to pursue Option 3 1.We are encountering difficulties finding a provider to test a window assembly under ASTM-331.
MPR6 - C&S and CI
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Emily Clark on
We are currently working on a Core & Shell project where a single tenant will be occupying the entire building. That tenant is also going for LEED under Commercial Interiors.
FSC Chain of Custody certification
EBOM-2009 MRc1:Sustainable purchasing - ongoing consumablesposted by Bahareh van Boekhold on
We are pursuing the LEED EB O&M certification of our main campus and the paper product we purchase from Office Max is FSC Chain of Custody certified.
Total Material Default Value
NC-2009 MRc4:Recycled contentposted by R. Ted Krasnesky on
I recently challenged a LEED reviewers interpretation of the total material default value.
Unclear sound isolation requirements at hallways
Pilot-Credits EQpc24:Acousticsposted by Matthew Azevedo on
The documentation requires a composite STC of 50 between Office / Conference Room and Hallway / Stairway.