Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Too early to determine the EnergyStar equipment

CI-2009 EAp2:Minimum energy performance
posted by  R Jones  on 

Our CI project won't be occupied until 2015 and the IT and AV equipment schedules aren't yet detailed, just an outline of the power demands for the M&E design is available.

3
Default Avatar
LEEDuser Premium Member
60 thumbs up
Thu Jul 25, 2013, 2:51 pm

Review Comment on Site Plan Notation

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Michelle Rosenberger  on 

So we got a comment on a recent NC project that the notation on the site plan indicating the set aside spaces said only "low emitting" and not both "low emitting" AND "fuel efficient".

3
Wed Jul 24, 2013, 10:09 pm

Documentation incomplete error and addenda text confusion

Schools-2009 WEc4:Process water use reduction
posted by  Shivani Langer  on 

This is what is listed in the addenda for the WEc4, Process water use reduction, post date is 7/19/2010: http://www.usgbc.org/Docs/Archive/General/Docs6392.pdf "Under Implementation WEc4 Process Wa

5
Wed Jul 24, 2013, 9:09 pm

new FAQ

NC-2009 MRc5:Regional materials
posted by  Tristan Roberts  on 

I have just added an FAQ to our guidance above, at GBCI's suggestion.

4
Wed Jul 24, 2013, 2:01 pm

Exemplary Point - Views

NC-2009 IEQc8.2:Daylight and views - views
posted by  Diane Mansfield  on 

Does anyone have experience achieving the exemplary point for views.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Jul 23, 2013, 8:05 pm

No HVAC / Natural Ventilation - Unmet Hrs

NC-2009 EAp2:Minimum energy performance
posted by  Chad Coleman  on 

Hello, I am currently working on a LEED NCv2009 project which includes a small building ~1,150sf, and has 200sf of regularly occupied space.

10
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jul 23, 2013, 2:38 pm

4 PCH Testing and SBR Verification

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Tom Nichols  on 

Can anyone assist with the 4-PCH IAQ testing exclusion? We are having difficulty verifying that all flooring products do not contain SBR.

6
Tue Jul 23, 2013, 4:20 am

Indoor AHUs and MERV 13 filters

EBOM-2009 IEQc1.4:Indoor air quality best management practices - reduce particulates in air distribution
posted by  Wendy Gibson  on 

The first paragragh in your "birds eye view" states that "As of November 2010, a USGBC addendum removed a requirement for return air circulation to also have MERV 13 filtration." Below is the Novem

3
Mon Jul 22, 2013, 9:08 pm

DOD and USGBC Agremeent for BEQ and ASHRAE 90.1

NC-2009 EAc1:Optimize energy performance
posted by  Suzanne Johnson  on 

I received a document by NAVFAC, which includes a statement that DOD and USGBC have agreed that BEQs are to be considered commercial facilities for transient populations under ASHRAE Std 90.1.

6
Default Avatar
Owner
The EcoLogic Studio
LEEDuser Basic Member
37 thumbs up
Mon Jul 22, 2013, 2:13 pm

Unavailable rainfall data

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Magda Aghababyan  on 

Hello, We have a project in Sri Lanka where we try to attempt this credit via percentile rainfall event option. However we find difficulty of getting continuous 30 year rainfall data.

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Jul 22, 2013, 12:35 pm