Forum quick links
unit (cf/storm)
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Ameet AA on
My project is using Option 1: Design stroms,Case 2 :Site with existing imperviousness mote than 50% LEED online template V 5.0 Table 6.1-3 Site runoff: Two year,24 hour Design storm quantity is r
ablution fixture
NC-2009 WEp1:Water use reductionposted by Erin Holdenried on
I assume an ablution fixture used to wash before entering a prayer room would have to be considered in the water use calculations. What would the baseline rate of the fixture be?
Using EBOM MRc8 as a LEED-NC ID Credit
EBOM-2009 MRc8:Solid waste management - durable goodsposted by Susan Di Giulio on
We have suggested that our client for a tech-intensive LEED-NC office project use E-waste recycling for an ID credit.
Non-US Green-E Available?
CS-2009 EAc6:Green powerposted by Yoyo Shek on
Do anyone know if the Green-E supplier is limited in US?
Definition of offices
CS-2009 IEQc8.2:Daylight and views - viewsposted by Ron Dean on
Hi, I want to know in the case that the building owner will rent all building offices, and design plans have a projected plant design free (without Closings) but the internal regulations of tenant
How are you interpreting this comment?
NC-2009 MRc5:Regional materialsposted by Valerie Molinski on
Review comment that I have never received before states the following: "Several products include recycled content but are listed as being 100% regional.
NSF Applicability to Rainwater Reuse?
Pilot-Credits WEpc10:Sustainable wastewater managementposted by John Nichols on
We are confused on how to pursue this credit for buildings with rainwater reuse systems.
ASHRAE Mandatory provisions 10.4
NC-2009 EAp2:Minimum energy performanceposted by Elena Grau on
Hello, I’m currently working on a LEED NCv2009 project located in Spain. My question is about the compliance of the section 10.4.1 (Electric Motors) of ASHRAE 90.1-2007.
Hand hygiene sign locations
EBOM-2009 IEQp3:Green cleaning policyposted by Sara Fontaine on
We are working on a LEED for Schools project. Can anyone provide clarity on if the hand hygiene notices are only required at the staff/employee sinks to help achieve this credit?
Light Scheduling
NC-2009 EAp2:Minimum energy performanceposted by Jean Marais on
1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? 2) Taking this a step furt