Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

unit (cf/storm)

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Ameet AA  on 

My project is using Option 1: Design stroms,Case 2 :Site with existing imperviousness mote than 50% LEED online template V 5.0 Table 6.1-3 Site runoff: Two year,24 hour Design storm quantity is r

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Wed Jun 19, 2013, 12:06 pm

ablution fixture

NC-2009 WEp1:Water use reduction
posted by  Erin Holdenried  on 

I assume an ablution fixture used to wash before entering a prayer room would have to be considered in the water use calculations. What would the baseline rate of the fixture be?

5
Tue Jun 18, 2013, 8:38 pm

Using EBOM MRc8 as a LEED-NC ID Credit

EBOM-2009 MRc8:Solid waste management - durable goods
posted by  Susan Di Giulio  on 

We have suggested that our client for a tech-intensive LEED-NC office project use E-waste recycling for an ID credit.

2
Tue Jun 18, 2013, 7:54 pm

Non-US Green-E Available?

CS-2009 EAc6:Green power
posted by  Yoyo Shek  on 

Do anyone know if the Green-E supplier is limited in US?

3
Default Avatar
Allied Environmental Consultants Limited
LEEDuser Basic Member
3 thumbs up
Tue Jun 18, 2013, 2:56 pm

Definition of offices

CS-2009 IEQc8.2:Daylight and views - views
posted by  Ron Dean  on 

Hi, I want to know in the case that the building owner will rent all building offices, and design plans have a projected plant design free (without Closings) but the internal regulations of tenant

3
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Mon Jun 17, 2013, 11:26 pm

How are you interpreting this comment?

NC-2009 MRc5:Regional materials
posted by  Valerie Molinski  on 

Review comment that I have never received before states the following: "Several products include recycled content but are listed as being 100% regional.

5
Default Avatar
Associate, AIA, LEED AP
TMP Architecture, Inc.
LEEDuser Basic Member
9 thumbs up
Mon Jun 17, 2013, 4:54 pm

NSF Applicability to Rainwater Reuse?

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  John Nichols  on 

We are confused on how to pursue this credit for buildings with rainwater reuse systems.

2
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Mon Jun 17, 2013, 1:57 pm

ASHRAE Mandatory provisions 10.4

NC-2009 EAp2:Minimum energy performance
posted by  Elena Grau  on 

Hello, I’m currently working on a LEED NCv2009 project located in Spain. My question is about the compliance of the section 10.4.1 (Electric Motors) of ASHRAE 90.1-2007.

2
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Mon Jun 17, 2013, 8:00 am

Hand hygiene sign locations

EBOM-2009 IEQp3:Green cleaning policy
posted by  Sara Fontaine  on 

We are working on a LEED for Schools project. Can anyone provide clarity on if the hand hygiene notices are only required at the staff/employee sinks to help achieve this credit?

6
Mon Jun 17, 2013, 3:08 am

Light Scheduling

NC-2009 EAp2:Minimum energy performance
posted by  Jean Marais  on 

1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? 2) Taking this a step furt

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Jun 14, 2013, 8:08 pm