LEED online template update
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Crissy Tsai on
Lauren, IEQc6.1 leed online template v4.0 states " Simple on/off switches may only count toward credit compliance for private offices" under the individual controls." This is a new requirement
EA Credit 1 - Using available waste oil for heating
NC-2009 EAc1:Optimize energy performanceposted by Charlene Steinman on
My project has unlimited free waste engine oil available.
Restored materials
NC-2009 MRc5:Regional materialsposted by jaume balana on
Our project scope is an historical building restoration and retrofit. Several items such as windows, doors and floor tiles are removed, restored in a workshop near the site project and returned to
Option 1, Case 1, Stream Channel Protection
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Adi Negara, LEED AP BD+C on
Hi all, We have a new construction project that is to build 30 ha factory, however the owner decided only to pursue LEED certification for the office building site, a small portion of the factory
Capturing rainwater and discharge to the public sewer
NC-2009 SSc6.2:Stormwater design - quality controlposted by Panupant Phapant on
The FAQ of SSc6.2 (http://www.leeduser.com/credit/NC-2009/SSc6.2#sthash.3UFoAJvd.dpuf) suggests that capturing the rainwater into tanks and discharging it into the public sewers after the rainstorm
Latest Minimum Requirements for IEQc6.1
CI-2009 IEQc6.1:Controllability of systems - lightingposted by Kathy Wislocky on
I see a few posts discussing the minimum requirements for both private offices and shared multi-occupant spaces, but some discussions are older and I'm wondering if LEED reviewer expectations or mi
Qualifying for MRc3
EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additionsposted by Kelly Webb on
Our project (111,000+ sq ft, six story office building) will have an entire floor remodel, lobby entry remodel, and four restroom remodels all occurring during the performance period, albeit not si
EAc2 Submission Requirements
CI-2009 EAc2:Enhanced commissioningposted by John Steingraeber on
I am very interested in pursuing LEED CI certification for a buildout of my firm's offices. This will be my/our first LEED project.
Performance Period for MRc3 versus EAc1
EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additionsposted by Karin Wohlert on
We are adding an addition to an existing facility. Ideally the performance period for energy would start after construction is complete.
Surface finish on Concrete Yards slab pursuing SSc7.1
NC-2009 SSc7.1:Heat island effect - nonroofposted by Sean Hogan on
Hi, Smoother finish looks better than brushed finish on concrete, Are there any SRI issues to consider in deciding on the final texture, or is that all a function of the (initial) concrete colour