Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Dorm - shared FCU and Controls

NC-2009 IEQc6.2:Controllability of systems - thermal comfort
posted by  Patrick MacPherson  on 

We have a University Dorm project and it is understood that we would be required to have at minimum 1 control for each dorm room. The mechanical system provided has 1 FCU for every 2 dorm rooms.

10
Director of Operations
WorkingBuildings, LLC
LEEDuser Expert
39 thumbs up
Thu May 16, 2013, 3:52 pm

Stormwater Inspection Checklist - Clarity/Support Needed

EBOM-2009 SSc6:Stormwater quantity control
posted by  Michelle Bracewell-Musson  on 

I am wondering if we can leave the sections below blank on the Stormwater Inspection Checklist due to only having large open turf/landscape areas and no retention ponds (we have ponds, but these ar

3
Thu May 16, 2013, 12:11 pm

Details on letter stating recycling content

CS-2009 MRc4:Recycled content
posted by  Michael E. Edmonds-Bauer  on 

I would like to know if someone has some experience with the level of detail the letters from manufactures need to be made.

6
Wed May 15, 2013, 9:45 pm

Manufacturer bulb information availability is lacking!

EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lamps
posted by  Laura Charlier  on 

Hello all. I have spent most of this week trying to complete research from the review comments. I have some questions, but also feedback for all of you. 1.

3
Senior Lead Engineer
Booz Allen Hamilton
LEEDuser Basic Member
1 thumbs up
Wed May 15, 2013, 7:48 pm

Change of tenant

NC-2009 PIf2:Project Summary Details
posted by  Antonio Rodriguez  on 

I am working in a CS project, which was registered under the future tenant's name, and has already achieved pre-certification.

3
Wed May 15, 2013, 3:54 pm

Green Power purchase after first review (out of the performance)

EBOM-2009 EAc4:On-site and off-site renewable energy
posted by  Patricia Fuertes  on 

We have already submitted the certification and we have received the return review, at this point we need to activate some more points in order to reach de 40 points for the certification.

5
Mon May 13, 2013, 9:29 pm

If some facades meet ASHRAE 90.1, but others don't....

CS-2009 EAp2:Minimum energy performance
posted by  Amit Ahiel  on 

....does the project meet ASHRAE 90.1's Mandatory Provisions and therefore this Prerequisite? Our project has complicated set of facades with different curtain-wall patterns and types of glass.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon May 13, 2013, 1:13 pm

Facilities for Rent

Schools-2009 SSc10:Joint use of facilities
posted by  PAULA HIDALGO  on 

Is allowable in terms of the credit requirements that the university project that I'm working with rents facilities to the community?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7784 thumbs up
Mon May 13, 2013, 12:29 pm

Solar subsidy vs grant

NC-2009 EAp2:Minimum energy performance
posted by  Tyra Sorensen  on 

We have a project that received a large grant from the state to put on Solar panels.

5
Mon May 13, 2013, 12:24 pm

Existing sidewalk inclusion?

Pilot-Credits PC14:Walkable Streets
posted by  emily reese moody  on 

Hi, I would like to attempt this credit for several of my current and future LEED projects.

4
Thu May 9, 2013, 9:12 pm