Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Choose the right one?

NC-2009 EAc1:Optimize energy performance
posted by  Robert Sutton  on 

Determine the interior lighting power allowance by using the columns designated Space-by-Space Method in Table 9.6.1.

11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed May 1, 2013, 2:18 am

IAQ Testing - no lab

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  MARIO DE JESUS CARMONA VINAS  on 

I have a project that will be conducting the Air Quality Testing.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Wed May 1, 2013, 2:04 am

Resinous Flooring - Healthcare Project

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Catherine Blakemore  on 

My project is installing resinous (pourable) flooring in a surgical addition. Does the mortar (binder) get logged in under the category of Ceramic Tile Adhesive (65 g/L)?

3
Wed May 1, 2013, 12:49 am

uploading OPR and BOD in the LEED On-Line

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Benjie Herrera  on 

Who is allowed to upload the OPR and BOD in the LEED On-Line?When can we upload these documents ?

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Apr 30, 2013, 11:11 pm

F-factor of slab for Proposed Design

NC-2009 EAp2:Minimum energy performance
posted by  Alicia Villanueva  on 

Dear alll, From a preliminary review, we received a comment regarding the Energy Modeling saying that the slab on grade floor of the proposed should be modeled using a F-factor, and not using the

7
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Apr 30, 2013, 2:31 pm

Fan operation for System 6

NC-2009 EAc1:Optimize energy performance
posted by  Francesco Passerini  on 

For system 6 (Packaged VAV with reheat) are both the VAV fans in the AHUs and the CAV fans in the PFP boxes considered among the "supply and return fans"?

3
Tue Apr 30, 2013, 1:24 pm

Compliance Factor Over 0.18

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Adrianna Schneider  on 

The document sample I have states that the compliance factor is calculated by WindowArea/FloorArea * VLT And then checking if it is between 0.15 and 0.18. When it is less than .015, then the amo

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Apr 29, 2013, 9:12 pm

EA Minimum Energy Performance - Star Rated Equipment

CI-2009 EAp2:Minimum energy performance
posted by  Anya Benkabbou  on 

Could an EPEAT Gold Cert equipment be considered equivalent to Energy Star qualified? Really appreciate clarification with this.

3
Associate
Ponte Mellor Architects, Ltd
LEEDuser Basic Member
0 thumbs up
Mon Apr 29, 2013, 7:15 pm

CxA Experience

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Ameet AA  on 

LEED online template/ form require the following: "Enter information for two projects commissioned by the CxA which are similar in scope and type to this LEED project building" I am working on L

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 29, 2013, 6:39 pm

M&V Plan for Residential Project

NC-2009 EAc5:Measurement and verification
posted by  Lauren Fakhoury  on 

Hi all, I'm working on a residential project where the tenants do NOT pay their utility bills.

3
Mon Apr 29, 2013, 3:04 pm