Forum quick links
International Project without Cut Sheets
NC-2009 MRc4:Recycled contentposted by Josh Sawyer on
We are working on an international project and the contractor is telling us that the standards in their country lack cut-sheets and MSDS sheets.
new LEED Interpretation
NC-2009 IEQc7.1:Thermal comfort - designposted by Tristan Roberts on
A new LEED Interpretation was released on 4/1/13 that is relevant to this credit.
Upload Documentation
NC-2009 SSc6.2:Stormwater design - quality controlposted by Albert Sagrera on
How can we upload documentation justifying this credit? Calculations on 90% average annual rainfall, 80% TSS removal, and other documentation?
Question
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Redy Truccolo on
Hi Everybody, I'm doing a CS 2009 Pre Certification and I've already achieved the 50% reduction for the WEc2 Innovative Wastewater technologies. My question is, if I apply for this Pilot Credit (w
Double skin facade model
NC-2009 EAp2:Minimum energy performanceposted by Florent Fabre on
Hi all, I’m working on a LEED certification on an office building with a double skin facade.
Required Number of Trips
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Caroline O'Leary on
I've been attempting to discover the number of times, or if there is a minimum number, that a bus must serve the stop in a day to count for this credit.
LEED Interpretation Rulings-When can they be followed?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Judy Landwehr on
Which of the below statements applies to a LEED Interpretation Ruling. The below statements appear to conflict with each other.
Comprehensive Transportation Management Plans
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Eric Shamp on
In the LEED 2009 BD&C Reference Guide, there is language in each of the SSc4 credits sections that indicates that a Comprehensive Transportation Management Plan (CTMP) can earn the project one
LEV/FEV parking space allotment in a campus setting
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Laura Charlier on
We are involved with a project that consists of two new student housing facilities on a college campus.
Alternative for ESC plan in hot climate zones (Outside the US)
NC-2009 SSp1:Construction activity pollution preventionposted by Eyad Haj Husein on
We're applying for LEED for New Construction in Doha, Qatar. The question is: where can I find information about the alternative of ESC plan?