Forum quick links
Showering and Changing Facilities in Men´s Bathroom
CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing roomsposted by Silvia Ruiz on
Hi, I am working on a small project that only requires one shower, but due to space constraints, the shower and changing room have been located inside the men's bathroom facilities.
Tandem Spaces
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Michael E. Edmonds-Bauer on
Our project, due to physical limitations of the site being this quite small, is providing mostly all of the spaces in tandem across 8 underground levels. According to calculations we need to provi
International Project without Cut Sheets
NC-2009 MRc4:Recycled contentposted by Josh Sawyer on
We are working on an international project and the contractor is telling us that the standards in their country lack cut-sheets and MSDS sheets.
new LEED Interpretation
NC-2009 IEQc7.1:Thermal comfort - designposted by Tristan Roberts on
A new LEED Interpretation was released on 4/1/13 that is relevant to this credit.
Upload Documentation
NC-2009 SSc6.2:Stormwater design - quality controlposted by Albert Sagrera on
How can we upload documentation justifying this credit? Calculations on 90% average annual rainfall, 80% TSS removal, and other documentation?
Question
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Redy Truccolo on
Hi Everybody, I'm doing a CS 2009 Pre Certification and I've already achieved the 50% reduction for the WEc2 Innovative Wastewater technologies. My question is, if I apply for this Pilot Credit (w
Double skin facade model
NC-2009 EAp2:Minimum energy performanceposted by Florent Fabre on
Hi all, I’m working on a LEED certification on an office building with a double skin facade.
Required Number of Trips
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Caroline O'Leary on
I've been attempting to discover the number of times, or if there is a minimum number, that a bus must serve the stop in a day to count for this credit.
LEED Interpretation Rulings-When can they be followed?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Judy Landwehr on
Which of the below statements applies to a LEED Interpretation Ruling. The below statements appear to conflict with each other.
Comprehensive Transportation Management Plans
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Eric Shamp on
In the LEED 2009 BD&C Reference Guide, there is language in each of the SSc4 credits sections that indicates that a Comprehensive Transportation Management Plan (CTMP) can earn the project one