Forum quick links
Thermal Comfort Survey and Corrective Action
Schools-2009 IEQc7.2:Thermal comfort - verificationposted by Ema S on
Does anyone know where I can find a thermal comfort survey and samples of plans for corrective action?
project boundary definition
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Emmanuel Pauwels on
Our Project consists of land that is property of the owner.
Which Parking Areas to Include?
NC-2009 PIf2:Project Summary Detailsposted by Kevin Flynn on
I am beginning work on a fairly complex project. The portion of the project seeking LEED certification is an office building attached to an existing building.
CS and CI fee relationship
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
I have a project where we are doing a CS certification for the building owner and a CI project for the main tenant at the same time. I was about to submit both for Preliminary Certification.
Certifying one LEED building on a campus
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa Sawin on
We have currently drawn our LEED boundary to include all areas that our building/scope of work is impacting.
Data Centers - Efficiency for UPS and computer servers for the
NC-2009 EAp2:Minimum energy performanceposted by Carlos Garcia on
Dear all We're working in the energetic simulation for the credit EA p 2 in LEED NC 2009 in a Data Center building.
Natural Ventilation: Which spaces are to be considered?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Marco Abdallah on
1. Are only regularly occupied spaces to be considered or all generally spaces (including stairs, corridors, storage and technical rooms)? 2.
Thermal Comfort (IEQc 7.1) for Industrial Applications
NC-2009 IEQc7.1:Thermal comfort - designposted by Ismaiel Salama on
We are targeting this credit for a project with more than 70% of the buildings are utilised for industrial, processing, storage and manufacturing activities.
Understanding how hazardous materials effect calculations
NC-2009 MRc2:Construction waste managementposted by Renee Shirey on
Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition.
Form Template Compliance
NC-2009 MRp1:Storage and collection of recyclablesposted by Erin Cowan on
We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.