Forum quick links
Snow blowers and Snow plow
EBOM-2009 SSc2:Building exterior and hardscape management planposted by Nelina Loiselle on
Do I need to include our snow blower in the Powered Equiptment inventory?
Ecotect Analysis
NC-2009 IEQc8.1:Daylight and views - daylightposted by Jorge Lopez de Obeso on
We are using Ecotect analysis 2011 to document credit IEQ 8.1.
Exterior lighting on building roof surface
NC-2009 EAp2:Minimum energy performanceposted by Wei Jiang on
I'm working on a project with sitting areas and outdoor swimming pool on a building flat roof surface and installed with exterior lighting.
Credit Achievement Rates
Schools-2009 MRc5:Regional materialsposted by Tim Crowley on
I see that LEEDUser is not posting Credit Achievement Rates.
Building Addition - reseeding turf grass - credit applicable
Schools-2009 WEc1:Water efficient landscapingposted by Michael Kros on
Our project in south-central South Dakota consists of a building addition over a previously graded turf area.
I still don't understand how
NC-2009 EAc4:Enhanced refrigerant managementposted by Nelina Loiselle on
I still don't understand how I am supposed to find out or calcuate int Rc? Is this a number you get from the manufacturer?
LEED-CI Commissioned system
CI-2009 EAp1:Fundamental commissioning of building energy systemsposted by Adam Targowski on
LEED-CI Commissioned system I have a question concerning commissioned systems. The office which I would like to certify with LEED CI will have only interior lighting changed.
Access to LEED rating EBOM MRc4 form?
NC-2009 IDc1:Innovation in designposted by Cynthia Ottenbrite on
We are using NC 2009, and looking to document an innovation point following EBOM MRc4: Mercury Reduction.
Case 2 calculator vs. Statement of Energy Performance
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by American University on
When I generate a Statement of Energy Performance for a non-rateable building, the SEP tells me that my building uses 23% less energy per square foot than the national median. 2 points, yay!
WEp1 Form - lav duration and "all fixtures installed >1/1/94"
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Lyle Axelarris on
I have two questions about the LEED Online WEp1 form: 1.