Hotel and Convention Center - Registration as One project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ahmad Gabir on
We have a hotel building (600,000 sf) and a convention center (150,000 sf) which are connected by a 300-400 feet ong corridor.
NC Comercial Building into a LEED ND Neighborhood (Stage 1)
NC-2009 SSc2:Development density and community connectivityposted by Gaston Viau on
Our project is located into a LEED Neighborhood Development which obtained Stage 1 certification.
Hazardous Chemical Clarification
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Edward Gulick on
The small project I'm working on will have a small janitors closet with a mop basin, as well as a stacked washer/dryer for rags and towels.
Differential Pressure Measurement
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Oliver Glahn on
Hello, has anyone experience in conducting the differential air pressure measurement of a smoking room with respect to each adjacent vertial chase? This requirement seems very difficult to meet.
buidable land
ND-v2009 SLLc6:Steep slope protectionposted by Noriko Nagazumi on
Hi, Is the definition of buildable land under LEED-ND identical to the following statement quoted from http://www.ci.blaine.mn.us/index2col.cfm?id=901246? "The space remaining on a lot after the mi
Can we earn this though new building
CI-2009 MRc2:Construction waste managementposted by Mathilda Jonsson on
Hi all! I'm working on a project which seeks LEED CS for the base building and LEED CI for a companys spaces.
New RP threshold for EAp1?
EBOM-2009 RPc1:Regional priorityposted by Donna Juselis on
We are currently working on a project in NC (zip 27244). The regional priority threshold for EAp1 Option 1 is supposed to be 28% (new bldgs) and 24% (existing bldgs).
What is an intersection?
ND-v2009 SLLc1:Preferred locationsposted by Timothy Nabholz on
I am currently using a radii around one of our potential sites and am trying to calculate how many intersections are within that radius.
Electricity Consumption - Option D
NC-2009 EAc5:Measurement and verificationposted by Yu Wang on
I'm working on an option D M&V plan according to LEED.
LEED HC WEc4.2 vs Pilot Credit 17
Pilot-Credits WEpc17:Cooling tower water useposted by April Eisenhauer on
A long-term healthcare project I have been working on that was registered under LEEDv2.2 recently got resistance for submitting LEED HC WEc4.2 as an ID credit.