Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Biodiesel?

CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  American University  on 

The glossary definition of "alternative-fuel vehicles use low-polluting, non-gasoline fuels such as electricity, hydrogen, propane, compressed natural gas, liquid natural gas, methanol, and ethanol

3
Tue Jan 29, 2013, 4:39 pm

Green Walls

CS-2009 SSc5.1:Site development - protect or restore habitat
posted by  Marcio Alberto Casado Pereira  on 

Hi all! Can I get any benefit from having green walls in my project, for the purpose of this credit? P.S: It is a Previously Developed Area.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Tue Jan 29, 2013, 4:15 pm

Which type of water needs to be filtered?

NC-2009 SSc6.2:Stormwater design - quality control
posted by  Marcio Alberto Casado Pereira  on 

Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct?

7
Tue Jan 29, 2013, 12:47 pm

Health Care - New Construction

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  William Kelly  on 

For IEQ credit 6.1 Controllability of Systems - Lighting: The requirements for patient areas states "to provide individual lighting controls for 90% (minimum) of patients to enable adjustments to s

4
Mon Jan 28, 2013, 8:22 pm

IEQ Pr1 - work code in France in place of ASHRAE

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Nicolas MOLLE  on 

Can you confirm me that it is possible, in France, to use the work code to determine the air rate in place of the ASHRAE 62.1-2007 in the places where this local code is more stringent ?

3
Mon Jan 28, 2013, 3:38 pm

Increasing Space Ventilation Efficiency by Increasing Vpz

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Ed Floyd  on 

Question seems to simple to me but I can not find a definate answer. Is it acceptable / Common to increase the primary air flow to a critical zone to increase the over system ventilation efficienc

2
Fri Jan 25, 2013, 12:31 am

Must Performance Period be complete before registering for pc67?

Pilot-Credits EApc67:Energy Jumpstart
posted by  Reid Middlebrooks  on 

Is pilot credit 67 only intended for projects that have already completed the EE improvements and can prove a 20% reduction?

2
Thu Jan 24, 2013, 6:33 pm

Erosion Control

NC-2009 MRc2:Construction waste management
posted by  Josh Mauldin  on 

The contractor on my project recently provided me with documentation that ~14 tons of concrete and brick that were removed from the site during demolition were used for erosion control.

3
Default Avatar
Sustainable Design And Construction Consultants, Paris, France
greenaffair
LEEDuser Basic Member
2 thumbs up
Thu Jan 24, 2013, 5:28 pm

ENERGY STAR sharing data in NC-2009

NC-2009 PIf1:Minimum Program Requirements
posted by  Ryan L  on 

For our project we have selected Option 1: Energy and Water Data Release Form.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Tue Jan 22, 2013, 4:58 pm

shopping mall

NC-2009 IEQc6.2:Controllability of systems - thermal comfort
posted by  Adam Targowski  on 

I'm working on a shopping mall project.

3
Director of Operations
WorkingBuildings, LLC
LEEDuser Expert
39 thumbs up
Mon Jan 21, 2013, 10:10 pm