Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Climate Controlled Self-Storage

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Greg Bly  on 

Does anyone know if the public storage areas, including all of the public aisles, are calculated as multi-occupant space?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Wed Jan 2, 2013, 6:16 pm

logistics ware house

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  soha yamani  on 

A NEW ware house project , it consist of : 1- 4 office rooms each with one person occupancy 2- And the ware house space with racks and 32 workers ( moving workers for packaging and moving stuff

3
Senior Sustainability Engineer
Metec Consultants
LEEDuser Basic Member
12 thumbs up
Wed Jan 2, 2013, 6:09 pm

Representative floorplans

NC-2009 PIf4:Schedule and Overview Documents
posted by  Michael E. Edmonds-Bauer  on 

I was considering sending every floor plan that has something different in order to comply with "representative floorplans", but I double thought about it and considered it would be a bit too much.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Jan 2, 2013, 5:46 pm

multiple renovation areas within a large hospital building

CI-2009 EAc3:Measurement and verification
posted by  Mark Taake  on 

The project does not qualify for LEED Healthcare, since it only involves discrete renovations within various segments of the building. Instead, application is being made under LEED CI.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Jan 2, 2013, 3:22 pm

Lighting Controls, SECTION 9.4.1, Standard 90.1-2007

CI-2009 EAp2:Minimum energy performance
posted by  Silvia Ruiz  on 

Hi everyone, I have a few questions regarding Section 9.4.1 Lighting Controls, 1.

2
Wed Jan 2, 2013, 3:12 pm

Floor Self-leveling

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Abdulrahman Sherazy  on 

Self-leveling material is used in making the floor flat and ready to be covered with vinyl flooring.

3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Wed Jan 2, 2013, 2:52 pm

Table G3.1.1 exceptions b and c interaction

NC-2009 EAp2:Minimum energy performance
posted by  Valentin Grimaud  on 

Dear all, We have a facility with lots of process areas having pressurization and code-related minimum circulation rates.

3
Thermal Engineer
TERAO Green Building Engineering
LEEDuser Basic Member
28 thumbs up
Mon Dec 31, 2012, 5:03 pm

CIv2009: Advanced Buildings Core Performance Guide (CPG)

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Marina Horchin  on 

Hi Everyone, We have two different versions of the CPG!

4
Thu Dec 27, 2012, 7:28 pm

Multiple Building -Energy Credits

Schools-2009 EAp2:Minimum energy performance
posted by  Ameet AA  on 

Does the LEED AGMBC require to have totally separate building systems so that the energy-related points can be clearly defined? My project has centralised Energy center which will be supplying chi

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Dec 27, 2012, 7:21 pm

Can occupant survey & monitoring be used as ID Credit?

NC-2009 IEQc7.2:Thermal comfort - verification
posted by  Lance Collins  on 

Our project is not able to show compliance with the requirements if IEQc7.1, but has still installed a permanent monitoring system and the owner has agreed to conduct occupant comfort surveys every

2
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Thu Dec 27, 2012, 7:18 pm