Forum quick links
FSC assembly requirement for LEED
NC-2009 MRc7:Certified woodposted by Paul Setzer on
Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.
summary for mechanically ventilated spaces
CS-2009 IEQc1:Outdoor air delivery monitoringposted by BH . on
So briefly (for C&S mechanically ventilated spaces): For densly occupied spaces we need: CO2 monitors and i.e.
Process energy
NC-2009 EAc1:Optimize energy performanceposted by Jatuwat Varodompun on
I got the reviewed comment on the process energy. The way I have modelled is try to add the process load to reach 25% minumum energy threshold eventhough such load does not exist.
Cooling Fuels
CI-2009 EAc3:Measurement and verificationposted by Nandana Kumar on
Hi, We need a clarification about the cooling fuels. What are cooling fuels referred to? Thank you Nandana
VAV Fume Hood Velocity in Proposed vs. Baseline Case
NC-2009 EAp2:Minimum energy performanceposted by Ralph Bicknese on
We have a University Science Building that will house research and teaching labs with multiple VAV fume hoods in several spaces.
Difference between this credit and prereq
ND-v2009 SLLc7:Site design for habitat or wetland and water body conservationposted by Lee Ann Walling, LEED AP ND on
Hi Eliot, I took your LEED-ND class in San Francisco.
Existing building, two parts, only one certified
NC-2009 EAc1:Optimize energy performanceposted by Francesco Passerini on
I am going to model an existing building that is being altered. The situation is as follows: A.
Make Up OA unit and energy modelling
NC-2009 EAc1:Optimize energy performanceposted by Jatuwat Varodompun on
my project is a hotel with the fan coils and Outdoor Air Units supplying the OA to each room.
Prime farmland vs farmland of statewide importance
NC-2009 SSc1:Site selectionposted by Lisa Sawin on
We have a site that is a previously developed urban site. According to the web soil survey from the USDA it is adjacent to Prime farmland and on Farmland of statewide importance.
office vs. hotel
NC-2009 IEQc8.2:Daylight and views - viewsposted by John Carino on
We are building a hotel and it seems many of the credits are focused on office buildings.