Recent

Conditioned floor

NC-2009 EAp2:Minimum energy performance
posted by  Rodrigo Dias  on 

Hello I'm working on a project that has conditioned areas on 6 floors, but in two of those floors has only 5% of all conditioned area , can I consider these floors conditioned as the another floo

5
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Fri Dec 7, 2012, 2:31 pm

Parking garage

NC-2009 EAp2:Minimum energy performance
posted by  PAWAN DAHIWAL  on 

I have modeled parking garage in the simulation by taking 0.75 cfm/sf (exhaust)from ASHRAE 62.1-2007 which leads to energy consumpation of 43,450kWh.

5
Thu Dec 6, 2012, 10:04 pm

Core and Shell project including restaurant

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Anna Korinkova  on 

Our project is a C&S building with a restaurant on the ground floor. A tenant has been already appointed but he wants to have his restaurant meant for smokers.

3
Thu Dec 6, 2012, 3:32 pm

EAp2

NC-2009 EAp2:Minimum energy performance
posted by  George Bender  on 

The project is a railcar vehicle maintenance facility (VMF) a couple acres large. This project falls under new construction and includes a new rail track to be brought into the VMF.

4
Thu Dec 6, 2012, 3:06 pm

Grass only, no irrigation

NC-2009 WEc1:Water efficient landscaping
posted by  Marcio Alberto Casado Pereira  on 

Hello Our client is using only grass in the landscaping and this is not going to be irrigated. Are we elegible for credit WEc1?

9
Default Avatar
LEEDuser Basic Member
27 thumbs up
Thu Dec 6, 2012, 2:29 pm

Systems Manual

CI-2009 EAc2:Enhanced commissioning
posted by  Frank Weiss  on 

I was envisioning the Systems Manual to be an O&M manual with drawings, equipment manuals etc. Upon GBCI review we received the comments shown below.

4
Thu Dec 6, 2012, 2:04 pm

Baseline for plumbing upgrades

EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiency
posted by  Jessica Hawley  on 

Please help me figure this out... We're working with a building built in the 80's, all original plumbing and fixtures.

8
Sustainability Professional
LEEDuser Expert
430 thumbs up
Thu Dec 6, 2012, 3:10 am

Evapotranspiration ETo for Brazil

CS-2009 WEc1:Water efficient landscaping
posted by  R Jones  on 

Can anybody tell me what the Evapotranspiration ETo for Brazil are? Or where to find them.

2
Wed Dec 5, 2012, 5:00 pm

Certify New Full Building Addition but Not Existing Building?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Jeremy Theodore  on 

Thanks to Tristan for getting me to the right forum on this, I will also be reading the guide but will post this question for any feedback the forum might have... Our project in question is a new

5
Default Avatar
Senior Project Architect
SHW Group
LEEDuser Premium Member
5 thumbs up
Wed Dec 5, 2012, 3:52 pm

Adjacent building

CI-2009 EAp2:Minimum energy performance
posted by  Luana Bertoletti  on 

Hi, I have a question about how modeling a building adjacent to an CI project model.

3
Wed Dec 5, 2012, 2:54 pm