CI Review Fee
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Jorge Lopez de Obeso on
We saw the CI Fees table and, since it caused so much impression about having a such small CI Retail and paying the same that a 50000sf project... we just want to make sure that this is it...
Demand control ventilation
CS-2009 EAp2:Minimum energy performanceposted by Michela Tedeschi on
Hello all, is it true that "Whenever credit is taken for demand control ventilation in the Proposed Case, the outside air ventilation rates for the Baseline Case must be modeled using minimum ASHRA
Option 1 for District Thermal Energy
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
I’m modeling a building that is connected to a district CHP system that produces heat and electricity. No cooling system, neither in the building nor in the CHP system, is available.
Definition of "conditioned space"
CS-2009 EAp2:Minimum energy performanceposted by Michela Tedeschi on
Hello all, a little question about the definition of "conditioned space".
GREENGUARD certified
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by SIG - Sustainability Main Account on
Does GREENGUARD certified furniture count as a sustainable criteria?
EA Cr 1.3 and District Thermal Energy
CI-2009 EAp2:Minimum energy performanceposted by M.S. Chan on
In the 8/13/10 document for Treatment of District or Campus Thermal Energy in LEED V2 & 2009, Appendix A says that District Energy Systems have no effect on any EA section prerequisites or cred
Using Heat Pump for Domestic Water Heating
CI-2009 EAp2:Minimum energy performanceposted by M.S. Chan on
We are using heat pumps for domestic water heating. (The water source will be from the campus/district condenser water system.) Can we take credit in the energy calculations using heat pumps?
international project outside US
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Sofia Otterheim on
Hi all we are doing a international project outside US. when we started to prepare for this credit we used the energy star portfolio to get a rating for project building.
Office Building + warehouse + Production Floor
NC-2009 EAp2:Minimum energy performanceposted by Jackson . on
Hi all, We have a project back in climate zone 1 and in the struggling to understand energy modeling for such building combination.
Densely occupied spaces exemption
EBOM-2009 IEQc1.2:Indoor air quality best management practices - outdoor air delivery monitoringposted by Katherine Ann Resurreccion on
Hi All, We have a project that has a lot of meeting rooms (area of each room is smaller than 150 square feet) that can accomodate 4 person per meeting room - therefore considered densely occupied