Option 1 for District Thermal Energy
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
I’m modeling a building that is connected to a district CHP system that produces heat and electricity. No cooling system, neither in the building nor in the CHP system, is available.
Definition of "conditioned space"
CS-2009 EAp2:Minimum energy performanceposted by Michela Tedeschi on
Hello all, a little question about the definition of "conditioned space".
GREENGUARD certified
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by SIG - Sustainability Main Account on
Does GREENGUARD certified furniture count as a sustainable criteria?
EA Cr 1.3 and District Thermal Energy
CI-2009 EAp2:Minimum energy performanceposted by M.S. Chan on
In the 8/13/10 document for Treatment of District or Campus Thermal Energy in LEED V2 & 2009, Appendix A says that District Energy Systems have no effect on any EA section prerequisites or cred
Using Heat Pump for Domestic Water Heating
CI-2009 EAp2:Minimum energy performanceposted by M.S. Chan on
We are using heat pumps for domestic water heating. (The water source will be from the campus/district condenser water system.) Can we take credit in the energy calculations using heat pumps?
international project outside US
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Sofia Otterheim on
Hi all we are doing a international project outside US. when we started to prepare for this credit we used the energy star portfolio to get a rating for project building.
Office Building + warehouse + Production Floor
NC-2009 EAp2:Minimum energy performanceposted by Jackson . on
Hi all, We have a project back in climate zone 1 and in the struggling to understand energy modeling for such building combination.
Densely occupied spaces exemption
EBOM-2009 IEQc1.2:Indoor air quality best management practices - outdoor air delivery monitoringposted by Katherine Ann Resurreccion on
Hi All, We have a project that has a lot of meeting rooms (area of each room is smaller than 150 square feet) that can accomodate 4 person per meeting room - therefore considered densely occupied
ENERGY COST BUDGET METHOD, ENVELOPE
CI-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
Greetings. I am working on a Commercial interior project pursuing the EAP2, and I chose the section 11 as an alternative to prescriptive approach, but, i am a little bit confused about how to sim
Concept Designers as CxA?
CS-2009 EAp1:Fundamental commissioning of building energy systemsposted by Ward Miller on
The project in question is a design and build project for which the general contractor will be assigned the project's design and construction activities; however, there is an architectural and engi