Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Modelling Naturally ventilated Parking

NC-2009 EAp2:Minimum energy performance
posted by  Maya Karkour  on 

Dear all, Will a project get credit for having naturally ventilated parking?

8
Partner
Flick Engineering Professionals
LEEDuser Premium Member
33 thumbs up
Mon Oct 1, 2012, 3:18 pm

EAp2/c1 Metering Requirements Also Earn EAc3.2?

EBOM-2009 EAc3.2:Performance measurement - system-level metering
posted by  American University  on 

If we had to meter things like hot water usage and chillers on a building level to comply with EAp2/c1 to do building-level metering of all incoming energy inputs, would we automatically be able to

2
Fri Sep 28, 2012, 9:02 pm

U-values soil and vegetation

NC-2009 EAp2:Minimum energy performance
posted by  John Covello  on 

Hello, We are working with and energy modeling software that does not have U-values for a soil or vegetated roof. Is there an official list (database) like ASHRAE LEED uses?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Fri Sep 28, 2012, 7:18 pm

"Site energy" usage for a multiple building project

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Chris Miller  on 

A small site has two office buildings, a storage building and parking lot.

6
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Fri Sep 28, 2012, 1:56 am

SSCr2 - Option 2 LEED Review

NC-2009 SSc2:Development density and community connectivity
posted by  Thomas Boyd  on 

Just received comments back from GBCI regarding our SS credit 2.

8
Associate Director
Atelier Ten
LEEDuser Basic Member
169 thumbs up
Thu Sep 27, 2012, 10:23 pm

Comparison EU energy rating vs Energy Star

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Maria Porter  on 

Please, has anyone done the comparison between Energy Star and the European energy rating system for appliances? Can you share it?

2
Thu Sep 27, 2012, 10:59 am

EAc 5.1 for CS tenant spaces

CS-2009 EAc5.1:Measurement and verification - base building
posted by  charles bell  on 

Our current design has a Quadlogic multi-tenant smart meter unit in the basement of our mid-rise project. This unit has the capacity for electrical power as well as BTU monitoring.

3
Default Avatar
principal
theGreenTeam, Inc.
LEEDuser Basic Member
10 thumbs up
Wed Sep 26, 2012, 8:22 pm

High cost of energy improvements

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Paulo Pinheiro  on 

Our building don´t have a good energy efficiency, the commissioning process indicate many ways to obtain a good energy efficiency, we are doing first the low cost way and after the high cost way, b

6
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Wed Sep 26, 2012, 2:21 pm

LPD and EA credit 1

CS-2009 EAc1:Optimize energy performance
posted by  Alex AC  on 

I hope everybody is having a great day! I came across this thread and a bunch of questions popped into my head.

5
Default Avatar
LEEDuser Basic Member
5 thumbs up
Tue Sep 25, 2012, 7:34 pm

HVAC System Baseline modeling

NC-2009 EAp2:Minimum energy performance
posted by  Henrique Mendes  on 

I´m not sure if we have modeled the HVAC baseline system correctly. We are in a climate zone 2a (São Paulo - Brazil).

3
Mr.
Green Domus | Desenvolvimento Sustentável
LEEDuser Basic Member
13 thumbs up
Tue Sep 25, 2012, 6:29 pm