Forum quick links
Discrepancy between forms
Schools-2009 IEQp3:Minimum acoustical performanceposted by Maura Adams on
For reasons I don't need to get into here, we started off using the LEED for School Beta form (version 0.2.3) but had to switch to Version 4.0.
Regularly occupied spaces in retail/grocery store?
EBOM-2009 IEQc2.4:Daylight and viewsposted by Alexander Aaltonen on
I am dealing with a case where the only explicit "work stations" are the cashier areas in the grocery store...
High Trans. Building - No fixtures for Trans. Occupants
NC-2009 WEp1:Water use reductionposted by James Del Monaco on
I have a 7,000 SF Physical Education Building which has a majority of the space decicated to PE type activities such as dancing, weightlifting, etc.
Temporized shower
NC-2009 WEp1:Water use reductionposted by Giorgia Lorenzi on
I have a metering shower: temporized for 30 second cycle, 10 liter/minute (from product data sheet). WEp1 simple form on leedonline notes "When using the metering lavatory faucet, please convert al
area calculations
NC-2009 IEQc8.1:Daylight and views - daylightposted by Carrie Laurendine on
first post ever.. no doubt dumb questions (sorry). Any input much appreciated. 1) do kitchens in a condo development count as regularly occupied? bedrooms?
Fans pressure - Baseline and Proposed
NC-2009 EAp2:Minimum energy performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the pressure to be considered for the baseline and proposed fan power.
Private vs. Public Lavatory Faucets
Schools-2009 WEp1:Water use reductionposted by Alison Y Rivenburgh on
I am working on two elementary schools, and the lower grade levels have private restrooms intended for individual student use in each classroom.
School Kitchen Pre-Rinse and Wash Sinks
Schools-2009 WEp1:Water use reductionposted by Art Irwin on
I am working on a high school project that includes a kitchen with both a pre-rinse sink and a three-tub sink that will have two faucets.
Lease agreement (signed by tenants)
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Rubén M. R. on
I'm working on a mixed-use CS project.
IAQ Testing method
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Adi Negara, LEED AP BD+C on
It's clear that for this credit, LEED only accepted IAQ testing using EPA or ISO method.