Only Some Water Uses Under LEED Scope
NC-2009 WEp1:Water use reductionposted by Patty Lloyd on
Reading this part of the website, I see that laboratory sinks are excluded from the credit. Where do exam room sinks fall into this?
Furniture
CI-2009 MRc7:Certified woodposted by Nelina Loiselle on
Furniture is not a part of our scope of work. Do we have to include it?
Multiple type of flow or flush fixtures
NC-2009 WEc3:Water use reductionposted by Yusuf Turab on
I have never quite understood what happens when a building uses many different types of fixtures.
Confirmation of Commissioning Experience
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Scott Rosch on
Given the subjective nature of LEED credit reviews, and the fact that a contract for commissioning is awarded and so much of the work is done prior to review of this credit, is there a means of ob
Absolute 50% CDs for Enhanced Commissioning?
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Nicole Ferrini on
I have a project that is approximately 75% complete with CD's. Both the CxA and myself (LEED AP) have just been brought on board. How strict is the 50% requirement for enhanced commissioning.
school example in documentation toolkit?
Schools-2009 WEp1:Water use reductionposted by William Weaver on
I was wondering if the LEEDuser team could provide an example of a completed template for a school project in the documentation toolkit.
Discrepancy between forms
Schools-2009 IEQp3:Minimum acoustical performanceposted by Maura Adams on
For reasons I don't need to get into here, we started off using the LEED for School Beta form (version 0.2.3) but had to switch to Version 4.0.
Regularly occupied spaces in retail/grocery store?
EBOM-2009 IEQc2.4:Daylight and viewsposted by Alexander Aaltonen on
I am dealing with a case where the only explicit "work stations" are the cashier areas in the grocery store...
High Trans. Building - No fixtures for Trans. Occupants
NC-2009 WEp1:Water use reductionposted by James Del Monaco on
I have a 7,000 SF Physical Education Building which has a majority of the space decicated to PE type activities such as dancing, weightlifting, etc.
Temporized shower
NC-2009 WEp1:Water use reductionposted by Giorgia Lorenzi on
I have a metering shower: temporized for 30 second cycle, 10 liter/minute (from product data sheet). WEp1 simple form on leedonline notes "When using the metering lavatory faucet, please convert al